To consider the above application.
Minutes:
Consideration was given to the above planning application.
The following attended the meeting and spoke in relation to the application:
Agent / Applicant: Jon Suckley
RESOLVED:
For the reasons set out in the report, and the update report, the application be APPROVED, as RECOMMENDED, subject to a S106 Agreement to secure:
S106 |
Amount |
Trigger |
Education (primary/secondary/SEN) |
£184,888 |
50% prior to Commencement of a dwelling, then 50% Prior to occupation 20th dwelling (or 50% percentile dwelling) |
Affordable Housing
|
30%
(tenure split of 8 rented units and 4intermediate housing units ).
|
Not more than of 50% of open market dwellings (sale/rent) shall be occupied until all affordable units within have completed and made ready for immediate occupation and use.
|
Arrangements for transfer to management company of all areas of planting /landscaping, POS/incidental open space Childrens play space, allotments/orchards and ecological areas
|
|
Prior to first occupation of the development |
Contribution to outdoor sports facilities |
£56,316 The financial contribution is £1,564 per family dwelling or £782.27 per bed space in apartments (to a maximum of £1,564.54 per apartment). The funds would be required on commencement of development and used in line with the Council’s adopted Playing Pitch and outdoor Sports Strategy. |
50% prior to Commencement of a dwelling, then 50% Prior to occupation 20th dwelling - -
|
NHS Healthcare
|
Financial contribution of £36,160 (£904 per dwelling/ apartment)
Calculated on following basis.
- Population served by surgery = 7,000 - Equivalent number of dwellings (at an average of 2.3 persons per dwelling) = 3,043 - Total cost of required primary care floorspace = £2,752,367 - Contribution cost per dwelling = £904 |
Prior to occupation 20th dwelling -
|
And the following conditions:
1. Commencement of development (3 years)
2. Development in accordance with approved plans
3. Details of facing materials
4. Details of hard surfacing treatments
5. Details of ground levels and finished floor levels
6. Submission of landscaping scheme
7. Implementation of landscaping
8. Details of Boundary treatment
9. Details for the provision of cycle storage and bin storage
10. Submission of Details for design of LAP
11. Submission of details of the main POS to include orchard, play and green gym items, short mown area for informal games, paths and seating. The approved scheme to be implemented in accordance with the approved details before first occupation of the development.
12. Revised drainage strategy to incorporates SUDS measures, subject to their suitability based on detailed ground investigations.
13. Provision of Ultra Low Emission Boilers
14. Implementation of Residents travel plan
15. Contaminated land – soil testing
16. Measures to deal with unexpected contamination
17. Implementation of Construction Environmental
Management Plan (CEMP)
18. Implementation of measures to minimise the risk of harm to Hedgehog and Brown Hare during works on site
19. Safeguarding of nesting birds
20. Details of lighting to safeguard bats
21. Provision of ecological enhancement features
22. Submission and implementation of a detailed habitat management plan
23. Removal of Permitted Development Rights (Part 1 Classes A and E) for plots 2 – 8 & plots 10 -13 (inclusive).
In the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/informatives/planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Planning has delegated authority to do so in consultation with the Chairman of the Strategic Planning Board, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Councillor Mike Muldoon left the meeting at this point.