To consider the above planning application.
Minutes:
Note: Councillors A Moran and P Butterill (Ward Councillors) attended the meeting and addressed the Committee on this matter.
The Committee considered a report regarding the above planning application, a written update and an oral report of the site inspection.
RESOLVED
(a) That, for the reasons set out in the report and the written update, authority be DELEGATED to the Head of Planning to APPROVE the application, following consultation with the Chairman of Southern Planning Committee, subject to:
· the satisfactory completion of a Section 111 Agreement with a Draft S106 Agreement attached to secure:
Overage provision to capture any uplift in value with any additional sums paid to the Council to invest back into education and health provision within the borough
· the following conditions:
1 Time limit
2 Approved plans
3 Materials
4 Compliance with the submitted Flood Risk Assessment, to include reference to the finished floor levels and existing and proposed levels across the site
5 Submission of a drainage strategy
6 Compliance with the noise report
7 Travel information pack
8 Low emission boilers
9 Electric vehicle charging points
10 Contaminated land X 3
11 Programme of archaeological work
12 Foul and surface water
13 Surface water drainage scheme
14 Piling
15 Obscure glazing to x2 living/kitchen/dining room windows on the western elevation
16 No removal of any vegetation or the demolition between 1st March and 31st August
17 Features for breeding birds
18 Safeguarding of nesting birds
19 Submission of provision of features for nesting birds
20 Submission of bat ‘friendly’ lighting scheme
21 Submission of measures for safeguarding of the adjacent water course from pollution during construction
22 Measures to minimise the risk of hedgehogs being injured during the construction phase
23 Method statement for the control of Himalayan Balsam
24 Open hours – 7 days/week
Shops 9am – 5pm
Restaurants 12.00 noon – 11pm
Café’s 8am – 6pm
25 Detail of gabion and railings
26 Landscaping both hard and soft including, detailed riverbank planting proposals, details of the green wall system along with its planning design and future maintenance arrangements, shrub planting around the base of the car park walls, species, sizes and locations for proposed trees including tree pit preparation in hard and soft areas, riverside retaining walls, paving materials and colours, railing types/locations, proposed tree grilles, seating opportunities and lighting locations
27 Details of cycle storage areas, to include cycle parking details for residents and visitors
28 Specification and manufacturers details of the proposed external lighting
29 A revised landscape/public realm design proposals plan to clearly show the location/extent of all features and include a key
30 Scheme of delivery times to the approved commercial uses to be submitted and agreed
31 Refuse storage to be submitted and approved
Informatives
1 Para 38 of the NPPF
2 Wyche House Bank stopping up order on the public highway
3 Cadent gas informative
4 Land drainage consent
5 Construction hours
6 Environment Agency advice
7 PROW
(b) That, in order to give proper effect to the Committee’s intentions and without changing the substance of the decision, authority be delegated to the Head of Planning, in consultation with the Chairman (or in his absence the Vice Chairman) of Southern Planning Committee, to correct any technical slip or omission in the wording of the resolution, before issue of the decision notice.