To consider the above application.
Minutes:
Consideration was given to the above application.
(Councillor P Findlow, the Ward Councillor, Parish Councillor Mrs T Jackson, representing Prestbury Parish Council, Judy McCoskery, representing Prestbury Amenity Society, Mr Carol Hamilton, representing Prestbury Business Forum, James Ireland, an objector, Andy Frost, a supporter and Rawdon Gascoigne, the agent for the applicant attended the meeting and spoke in respect of the application).
RESOLVED
That for the reasons set out in the report the application be approved subject the completion of a Section 106 Agreement securing the following:-
• 20,000 for off-site provision of Public Open Space for improvements, additions and enhancement of existing Public Open Space and amenity facilities in Prestbury; and
• £7,000 for the off-site provision of recreation/outdoor sport (outdoor sports facilities and pitches, courts, greens and supporting facilities/infrastructure) for improvements, additions and enhancements of existing recreation / outdoor sports facilities in Prestbury.
• £29,500 to provide support and opportunities for young people and youth clubs and organisations in and around Prestbury.
And subject to the following conditions:-
1. A03FP Commencement of development (3 years)
2. A01AP Development in accord with approved plans
3. A02EX Submission of samples of building materials
4. A01GR Removal of permitted development rights
5. A07EX Sample panel of brickwork to be made available
6. A10EX Rainwater goods
7. A12EX Fenestration to be set behind reveals
8. A17EX Specification of window design / style
9. A20EX Submission of details of windows
10. A21EX Roof lights set flush
11. A22GR Protection from noise during construction (hours of construction
12. A23GR Pile Driving
13. A25GR Obscure glazing requirement
14. A02HA Construction of access
15. A01HP Provision of car parking
16. A07HA No gates - new access
17. A32HA Submission of construction method statement
18. A01LS Landscaping - submission of details
19. A04LS Landscaping (implementation)
20. A12LS Landscaping to include details of boundary treatment
21. A01TR Tree retention
22. A02TR Tree protection
23. A04TR Tree pruning / felling specification
24. A19MC Refuse storage facilities to be approved
25. A02CA Demolition as precursor of redevelopment
26. Bat mitigation (including bat loft) to be provided
27. Breeding Bird Survey to be submitted
28. Provision and management of undeveloped ecological buffer zone
29. Scheme to minimise dust emissions arising from demolition / construction activities to be submitted
30. Phase II contaminated land survey to be submitted
31. Details of foul and surface water drainage to be submitted
32. Written scheme of archaeological investigation to be submitted
33. Details of existing and proposed ground levels to be submitted with finished floor levels of the buildings set at a minimum of 101.78 m AOD, and no alteration of existing ground levels within the 1% flood outline
In order to give proper effect to the Committee’s intentions and without changing the substance of the decision, authority is delegated to the Planning and Enforcement Manager, in consultation with the Chairman (or in his absence the Vice Chairman) of Northern Planning Committee to correct any technical slip or omission in the wording of the resolution, between approval of the minutes and issue of the decision notice.
(The meeting was adjourned for a short break. Prior to consideration of the following item, Councillor B Burkhill left the meeting and did not return).
Supporting documents: