To consider the above application.
Minutes:
(Prior to the consideration of the following item, Cllr Hoyland left the meeting and did not return).
Consideration was given to the above application.
(The Chairman read out a letter on behalf of Cllr L Roberts, one of the Ward Members. Mr Cook, an objector and Mrs K Phillips, representing the applicant attended the meeting and spoke in respect of the application).
RESOLVED
That for the reasons set out in report and the Officer’s update to the Board, the Board grant delegated powers to the Development and Building Control Manager to approve, subject to the completion of a Section 106 legal agreement comprising the following Heads of Terms:-
· 30% Affordable Housing = 33 units be 65% social or affordable rent, and 35% intermediate tenure
· A contribution of £70 000 towards highway improvements to be made to the A523, north of the application site. with particular consideration towards the provision of signage, road layout, impact on roundabout flares and traffic calming in the vicinity of Tytherington Lane
· Leisure Services have stated that the quantity of public open space to be provided on site would be acceptable subject to a detailed scheme for the design and layout of the open space to be approved prior to commencement. A NEAP will also be required.
· A commuted sum would be required for Recreation / Outdoor Sport of £77,000 (which includes discount of £33,000 for the affordable housing based on the affordable dwellings). The commuted sums would be used to make improvements, additions and enhancements to the facilities at Rugby Drive playing field. The Recreation / Outdoor sports commuted sum payment will be required prior to commencement of the development
· A 15 year sum for maintenance of the open space will be required IF the council agrees to the transfer of the open space to CEC on completion. Alternatively, arrangements for the open space to be maintained in perpetuity will need to be made by the developer, subject to a detailed maintenance schedule to be agreed with the council, prior to commencement
· Provision of art in public areas to be incorporated into the landscaping scheme
and subject to the following conditions :-
1. A06OP - Commencement of development
2. A03OP - Time limit for submission of reserved matters (within 1 year)
3. A01OP - Submission of reserved matters
4. A02OP_1 - Implementation of reserved matters
5. A09OP - Compliance with parameter plans
6. A10OP_1 - Details to be submitted -layout
7. A08OP - Ground levels to be submitted
8. A01LS - Landscape Masterplan - submission of details
9. A04LS - Landscaping (implementation)
10. A01GR - Removal of permitted development rights
11. A02HA - Construction of access
12. A04HA - Vehicular visibility at access to be approved
13. A32HA - Submission of construction method statement
14. A19MC - Refuse storage facilities to be approved
15. At least 10% of the energy supply of the development shall be secured from decentralised and renewable or low-carbon energy sources
16. Phasing of landscaping works - along Silk Road first
17. Submission of a landscape management scheme to be submitted with the Reserved Matters application
18. The landscaping scheme shall incorporate details of boundary treatment
19. Protection of breeding birds
20. Provision of bird boxes
21. Arboricultural Implication Study required
22. Details of lighting to be approved
23. the maintenance of a 3 m landscape bund as protection
24. the constructional specifications of the proposed dwellings in terms of wall construction, standard of glazing and the provision of system 4 mechanical ventilation as noise mitigation measures to the identified dwellings.
25. Piling - contractor to be members of the Considerate Construction Scheme
26. Hours of construction/noise generative works
27. Mitigation to follow submitted air quality assessment
28. Submission of a drainage scheme including details in respect of surface water run-off
29. Submission of a scheme to manage the risk of flooding to be submitted
30. Submission of a Character Assessment justifying scale, layout and materials as part of the Reserved Matters application
31. Maximum scale of dwellings
32. Contaminated land
33. Times of Piling
34. Times of floor floating
35. Details of bin storage
36. No fires during construction