To consider the above application.
Minutes:
(During consideration of the application, Councillor G Walton left the meeting and did not return).
Consideration was given to the above application.
(Councillor B Livesley, the Ward Councillor, Councillor K Edwards, a Cheshire East Councillor, Town Councillor Mrs Sockett, a Bollington Town Councillor, Sandra Edwards, the Chairman of Bollington Civic Society, Mr Ransley, an objector, Daniel Ashton, a Supporter and Richard Barton, the agent for the applicant attended the meeting and spoke in respect of the application).
RESOLVED
That for the reasons set out in the report and in the Officers update to Board the application be approved subject to the completion of a S106 Agreement securing:-
(a) 15% affordable housing, intermediate tenure,
(b) Transfer of on site public open space to a Local Residents Management Company for management and maintenance in perpetuity
(c) £4,000 for Local Traffic Regulation Orders
(d) £270,000 to be divided between
· Formal and/or informal play at Adlington Road, Bollington Recreation Ground and Coronation gardens
· Improvements to sports provision at Bollington Recreation Ground including changing facilities
· Improvements to Middlewood Way
· Maintenance strategy and watching brief regarding works to the viaduct phased over a number of years
· Repairs to part of the viaduct
· Bollington Youth Cross Project
In portions to be decided by the Development Management Building Control Manager in consultation with the Chair of Strategic Planning Board and Ward Councillors, and subject to the following conditions:-
1. A06OP - Commencement of development
2. A03OP - Time limit for submission of reserved matters (within 3 years)
3. A01OP - Submission of reserved matters
4. A02OP - Implementation of reserved matters
5. A09OP - Compliance with parameters – 8.5m for 2 storey, 11.0m for 3 storey
6. A08OP - Ground levels to be submitted
7. A01LS - Landscape - submission of details
8. A04LS - Landscaping (implementation)
9. A01GR - Removal of permitted development rights
10. A02HA - Construction of access
11. A04HA - Vehicular visibility at access to be approved
12. A32HA - Submission of construction method statement
13. A19MC - Refuse storage facilities to be approved
14. At least 10% of the energy supply of the development shall be secured from decentralised and renewable or low-carbon energy sources
15. Protection of breeding birds
16. Provision of bird boxes
17. Submission of further badger survey in support of any reserved matters application.
18. Submission of method statement for the eradication of non-native invasive species.
19. Details of lighting to be approved
20. Piling - contractor to be members of the Considerate Construction Scheme
21. Times of Piling
22. Hours of construction/noise generative works
23. Noise mitigation – details to be submiitted and approved
24. Dust mitigation - details to be submiitted and approved
25. Contaminated land – Phase II land investigation required
26. Mitigation to follow submitted air quality assessment
27. Submission of a drainage scheme including details in respect of surface water run-off
28. Development to accord with Flood Risk Assessment
29. Number / type of dwelllings
30. Method statement for the removal of the weir should be submitted for approval
31. Method statement for any bank works, including reprofiling, should be submitted for approval
32. Management plan for the buffer riparian/linear park area adjacent to the River Dean should be submitted for approval
33. Management plan for the eradication or management of the invasive plant species on site should be submitted for approval
34. Scheme to dispose of foul and surface water to be submitted and approved
35. A scheme to deal with the risks associated with contamination of the site shall each be submitted to and approved
36. A verification report demonstrating completion of the works set out in the approved remediation strategy to be submitted and approved
37. Piling and foundation design to be submitted and approved
38. Minimum width of linear park to be 12m in accordance with the indicative layout – to include footpath and cycleway
39. Implementation of public open space areas – to include interpretation panels
40. Arboricultural Implication Study required
41. Minimum distance between rear of properties facing the viaduct and the viaduct to be 24m
42. An archeaological watching brief and programme of works to be submitted to and approved for the leat, wheel pit and engine house aspects of development
43. Retention of part of leat – details to be submitted and approved as part of reserved matters application
44. Relocation of Co-op
(The meeting was adjourned from 4.25pm until 4.35pm).
Supporting documents: