Mr I Hilliker (on
behalf of the applicant) attended the meeting and addressed the
Committee on this matter
The Committee considered a report regarding
the above planning application and a written update.
RESOLVED
That the application be
DELEGATED to the Development Management and Building Control
Manager in consultation with the Chair of the Strategic Planning
Board for further negotiation regarding the affordable housing
provision/S106 contribution. The application is to be APPROVED
subject to final negotiations and a prior appropriate S106
Agreement securing:
- Affordable housing – the
number and tenure split of the affordable housing will be no less
that 19.7% (53 units in total) comprising at least 65% (34 units)
affordable rent and 35% shared ownership (19 units).
- The shortfall of £44,332 which
arises in lieu of the renewable energy compliance measure subsidy
shall be used either to provide an additional affordable housing
unit or to increase the following obligations as appropriate.
- A contribution towards local
education provision of £466,390.
- The provision of a LEAP, Public Open
Space and footway/cycle link which should be retained in perpetuity
and a scheme of management.
- A commuted payment towards
canalside/PROW improvements
(£117,748).
- An Interim Residential travel plan
in accordance with DfT guidance
document.
- A commuted sum for the necessary
Traffic Regulation Orders, local traffic management orders and bus
stops (£44,000).
And the following conditions:
- Standard time – 3 years.
- Materials to be submitted to the LPA
and approved in writing.
- Submission of a landscaping scheme
to be approved in writing by the LPA.
- Implementation of the approved
landscaping scheme.
- No trees to be removed without the
prior written consent of the LPA.
- Boundary treatment details to be
submitted to the LPA and approved in writing.
- Remove PD Rights for extensions and
alterations to the approved dwellings.
- If protected species are discovered
during construction works, works shall stop and an ecologist shall
be contacted.
- Prior to any commencement of works
between 1st Marc and 31st August in any year,
a detailed survey is required to check for nesting birds.
- Prior to the commencement of
development the applicant to submit detailed proposals for the
incorporation of features into the scheme suitable for use by
breeding birds.
- The proposed development to proceed
in accordance with the recommendation made by the submitted Badger
survey report and method statement dated October 2011.
- The development hereby permitted
shall not be commenced until such time as a scheme to limit the
surface water run-off generated by the proposed development, has
been submitted to and approved in writing by, the Local Planning
Authority.
- The development hereby permitted
shall not be commenced until such time as a scheme to manage the
risk of flooding from overland flow of surface water, has been
submitted to, and approved in writing by, the Local Planning
Authority.
- Acoustic mitigation measures to be
submitted and agreed.
- The hours of construction shall be
limited to 08:00-18:00 Monday to Friday, 09:00-14:00 Saturday and
not at all on Sundays or Bank Holidays.
- Any piling works shall be limited to
08:30-17:30 Monday to Friday, 09:00-13:00 Saturday and not at all
on Sundays or Bank Holidays.
- The remedial scheme shall be carried
out in full accordance with original remedial scheme provided under
application 07/0912/OUT and addenda provided under this
application. These details shall not be
varied without the prior written consent of the Local Planning
Authority.
- A Site Completion Report detailing
the conclusions and actions taken at each stage of the works,
including validation works, shall be submitted to, and approved in
writing by, the LPA prior to the first occupation of any part of
the development hereby approved.
- No building within 3 metres of the
public sewer which crosses the site.
- Completion of the proposed off-site
highway works.
- Details and location of the
contractors compound together with details of management of the
site to be submitted to the LPA and approved in writing.
- Measures to show how mud, clay or
other material is not deposited on the highway.
- Details of external lighting to be
approved in writing by the LPA.