To consider the above planning application
Minutes:
(Councillor S Wilkinson, the Ward Councillor; Ms L Gimson, representing the agent for the applicant attended the meeting and spoke in respect of the application).
The Committee considered a report regarding the above planning application, a written update and an oral update by the Planning Officer
RESOLVED:
That the Development Management and Building Control Manager, in consultation with the Chairman, be granted delegated authority to approve the application, subject to the submission and approval of Acoustic Report to demonstrate compliance with recommendations of EHO, and subject to conditions and completion of
(a) A Section 106 Agreement to secure:
1. Tabley
2. Adjoining Rural Parishes
3. Rural Knutsford Sub Area as identified in the SHMA 2010
4. Knutsford
5. Cheshire East
· commuted sum of £24,000 to be paid to the Council to make additions, enhancements and improvements to the existing open space off Holly Grove in Tabley.
(b) the following conditions:
1. Commencement of development (3 years)
2. Development in accord with approved plans
3. Submission of samples of building materials
4. Obscure glazing requirement
5. Landscaping – submission of details
6. Landscaping (implementation)
7. Landscaping to include details of boundary treatment
8. Removal of permitted development rights
1. Draining details
2. Phase II contaminated land survey
3. Safeguarding breeding birds
4. Enhancement for breeding birds
5. Provision of access for United Utilities to their site
6. Construction method statement to include on-site compound, pile foundation restrictions, hours of construction and wheel washing.
7. All habitable rooms shall have glazing with a minimum sound reduction index of RTRA 33dB. The unit shall be installed in accordance with the manufacturer’s recommendations to avoid air gaps when fitting the frames. Details of the selected glazing shall be forwarded to the LPA for approval prior to its installation and shall be retained thereafter.
8. Acoustically treated passivent ventilation system as detailed in para 5.3 Mitigation of ADC, dated 8th September (TV AL 450/40) shall be installed with the units.
9. Prior to the occupation of the approved dwellings the approved acoustic mitigation shall be completed/installed in full accordance with the approved details and retained at all times thereafter.
10.Before the use of the development is commenced, a Validation Test of the sound attenuation works shall be completed and the results submitted to and approved by the Local Planning Authority. Such validation test shall:
a) Be carried out in accordance with an approved method statement.
b) Demonstrate that the specified noise levels have been achieved. In the event that the specified noise levels have not been achieved, then notwithstanding the sound attenuation works thus far approved, a further scheme of sound attenuation works capable of achieving the specified noise levels and recommended by an acoustic consultant shall be submitted to and approved by the Local Planning Authority before the use of the development is commenced.
Such further scheme of works shall be installed as approved in writing by the Local Planning Authority before the use is commenced and shall thereafter be retained unless otherwise agreed in writing with the Local Planning.