To consider the above planning application.
Minutes:
The Committee considered a report regarding the above planning application. In addition a further oral update was provided at the meeting in respect of car parking spaces which had been amended to reflect the Officers advice which was to provide 5 car parking spaces and not the 7 as originally had been offered by the applicant.
The Committee requested that there be an amendment to condition 4 to include the following wording:-
‘’The parking and turning area, and driveway, shall be constructed using permeable surfacing materials in accordance with details to be submitted to and approved in writing by the Local Planning Authority. “
RESOLVED
That the application be approved subject to the following conditions:-
1. Standard time limit
2. Plans Reference
3. Details of finished floor levels to be submitted, approved and implemented
4. Details of surfacing materials, in particular permeable materials to be submitted, approved and implemented
5. Details of materials to be submitted, approved and implemented
6. Details of boundary treatment to be submitted, approved and implemented
7. Details of landscaping to be submitted including the boundary separating the application site from Elbury and the site frontage
8. Landscaping to be implemented and maintained for a 5 Year period
9. Remove PD Rights for all alterations, extensions and outbuildings
10. All services to be located underground
11. Provision shall be made for car parking spaces at all times
12. Details of the method, timing and duration of any pile driving shall be approved and implemented.
13. Contaminated Land Survey phase I report to assess potential/actual contamination risks to be submitted and approved. Should the phase I report recommend that a phase II investigation is required, the phase II investigation shall be carried out and the results submitted and approved. Should the phase II report indicate remediation is required, a Remediation Statement shall be submitted and approved. The remedial scheme in the approved Remediation Statement shall then be carried out. Should remediation be required, a Site Completion Report detailing the conclusions and actions taken at each stage of the works, including validation works, shall be submitted and approved prior to the first use or occupation of any part of the development
14. No development shall commence until an assessment of traffic noise (and vibration) has been submitted and approved. The recommendations in the report shall be implemented in accordance with the approved details.
15. The hours of construction and associated deliveries to the site shall be restricted to 0800 to 1800 hours Monday to Friday, 0800 to 1300 hours Saturday, with no work at any other time
16. Details of drainage system including septic tanks, soakaways, permeable surfaces to be submitted, approved and implemented.
17. All proposed doors/windows and any subsequent replacements shall have a Minimum 55mm Reveal
18. No agricultural vehicles to park within the curtilage of the proposed development
19. No development shall take place until detailed drawings outlining the site’s access arrangements have been submitted to and approved by the LPA and no part of the development shall be occupied until the access has been constructed in accordance with approved drawings.