To consider the above application.
Minutes:
(Prior to consideration of the item, the Northern Area Manager gave a summary to Members regarding the recent Planning Inspector’s decisions on a number of appeals prior to consideration of the following item).
Consideration was given to the above application.
RESOLVED
That for the reasons set out in the report the application be approved subject to the completion of a Section 106 Agreement securing the following:-
£14000 commuted sum towards public realm improvements in the Park Green Area.
And subject to the following conditions:-
1. A03FP - Commencement of development (3 years)
2. A02AP - Detail on plan overridden by condition
3. A02EX - Submission of samples of building materials (external surfaces)
4. A07EX - Sample panel of brickwork to be made available
5. A11EX - Details to be approved (eaves, rainwater goods, doors, chimney stacks, etc.)
6. A20EX - Submission of details of windows
7. A18EX - Specification of window design / style
8. A01GR - Removal of permitted development rights
9. A01LS - Landscaping - submission of details
10.A04LS - Landscaping (implementation)
11.A13LS - Details of walls, piers, gates, fencing , steps, railings, copings to be submitted
12.A02TR - Tree protection (details to be submitted)
13.A22GR - Protection from noise during construction (hours of construction)
14.Noise mitigation scheme to be submitted
15.Details of mechanical ventilation and heat recovery scheme to be submitted
16.Dust control (details to be submitted)
17.Floor floating (details, if undertaken)
18.Contaminated land Phase II Study to be submitted
19.Drainage (to comply with united utilities requirements) details to be submitted
20.Details of existing and proposed levels to be submitted
21.Submission of a Construction Method Statement
22.Bin storage