To consider the above planning application.
Minutes:
The Committee considered a report regarding the above planning application.
RESOLVED - That, for the reasons set out in the report, the application be APPROVED subject to the satisfactory completion of a Deed of Variation to the Section 106 Legal Agreement attached to 13/0100C to secure incorporation of the layout detailed within 13/3680C and the following conditions:
1. Time limit – 3 years
2. Plans
3. Materials – samples to be agreed
4. Access to be constructed, formed and graded to satisfaction of highways authority
5. Protection of highway from mud and detritus during construction
6. Tree and hedgerow protection measures
7. Arboricultural Specification/Method statement
8. Details of Hard and Soft Landscaping to be submitted prior to commencement. Landscape scheme to include replacement native hedgerow planting and trees for ecological purposes and boundary treatments
9. Implementation of landscaping scheme, including replacement hedgerows
10. Submission of updated ecological survey (badger)
11. Breeding Bird Survey for works in nesting season
12. Bats and bird boxes
13. Translocation scheme for reptiles to proceed in full accordance with the submitted Reptile Mitigation Strategy produced by RSK dated October 2012 prior to commencement of any demolition or development on site
14. Site drainage on separate system - details to be submitted
15. The hours of construction/demolition of the development (and associated deliveries to the site) shall be restricted to: Monday – Friday 08:00 to 18:00 hrs Saturday 09:00 to 14:00 hrs Sundays and Public Holidays Nil
16. Should there be a requirement to undertake foundation or other piling on site it is recommended that these operations are restricted to: Monday – Friday 08:30 – 17:30 hrs Saturday 09:30 – 13:00 hrs Sunday and Public Holidays Nil
17. Submission of mitigation measures to minimise any impact on air quality from construction dust
18. Submission of a Contaminated Land Phase II investigation.
19. Submission of Construction Management Plan (inc wheel wash facilities, location of contractors parking, storage of site cabins etc) for access via Nantwich Road
20. Construction specification/method statement
21. No new windows – gable elevations plot 12 and 15
22. Details of design / surfacing of proposed footpath links to site frontage
23. Open plan estate layout – removal of permitted development rights for fences in front gardens
24. Removal of permitted development rights for extensions-plots 11,12,12a,14,15,16,17,18,19,20,21,22,23
25. Details of ground levels to be submitted
26. Details of bin/bike store to be submitted and implemented for plots 12-15
27. Method statement (trees) footpath link to Nantwich rd and construction of walls/access way to rear plot 12-15 - Nantwich Rd
28. Management scheme to be submitted for the maintenance of communal garden area plots 12-15
29. The parking provision to plots 12 to 15 shall be a maximum of 150%