To consider the above application.
Minutes:
Consideration was given to the above application.
(Paul Williams and Joanne Bonnington the agents for the applicant attended the meeting and spoke in respect of the application).
RESOLVED
That for the reasons set out in the report, the application be approved subject to the completion of a Section 106 Agreement securing the following:-
· Dwellings to be 100% affordable rented in perpetuity
· Recreation Space - Enhanced provision £2930.24
· Maintenance £9552.00
· Commuted sum of £8,897.60 as compensation for loss of habitat/impact on wildlife corridor
And subject to the following conditions:-
1. Time limit
2. Plans
3. Materials
4. Final detail for the designed treatment of the Forge Lane carriageway/footway provisional scheme in line with the final Road Safety Audit to be submitted prior to commencement of development.
5. Interior road design and construction plans for the proposed development layout within the site to be submitted prior to commencement of development.
6. Submission and implementation of Tree and hedgerow protection measures
7. Arboricultural Specification/Method statement
8. Submission of landscaping scheme inc hard landscaping include replacement native hedgerow planting and boundary treatments
9. Implementation of landscaping scheme
10.Breeding Bird Survey for works in nesting season
11.Bats and bird boxes
12.Jodrell Bank – standard electromagnetic condition
13.The development shall fully accord with the submitted Method Statement for Badger Sett Closure unless varied by a subsequent Natural England license.
14.Ecological Mitigation to include the provision of a planted 5m buffer both along the northern boundary of the site and around the identified sett. Details to be submitted prior to commencement of development
15.Site drainage details to be submitted
16.The hours of construction of the development (and associated deliveries to the site) shall be restricted to: Monday – Friday 08:00 to 18:00 hrs Saturday 09:00 to 14:00 hrs Sundays and Public Holidays Nil
17.Should there be a requirement to undertake foundation or other piling on site it is recommended that these operations are restricted to: Monday – Friday 08:30 – 17:30 hrs Saturday 09:30 – 13:00 hrs Sunday and Public Holidays Nil
18.Submission of mitigation measures to minimise any impact on air quality from construction dust
19.Submission of Construction Management Plan, including site compound/details of materials store
20.Open plan estate layout – removal of permitted development rights for fences
21.Bin store details to be submitted
22. Removal of permitted development rights for extensions and outbuildings
23.Details of ground levels (existing and proposed) to be submitted and approved prior to development to include level garden areas to dwellings. No approval for proposed levels
24. Method Statement for removal of Himalayan Balsam
25. 2 car parking spaces per dwelling to be permanently retained in areas shown on approved plan
26.Submission and implementation of a scheme for the provision and management of the buffer zone alongside the rear boundary of plots 8-14 to include details of planting, management plan for the buffer zone
27. Provision of grit boxes