Meeting: 17/07/2013 - Strategic Planning Board (Item 45)

45 12/4866W Danes Moss Landfill Site, Congleton Road, Gawsworth, Macclesfield, Cheshire SK11 9QP: To develop and operate a temporary waste transfer station; retention of the existing access road, car parking and weighbridge/weighbridge office; realignment of the internal haul road; hardstandings; earthworks; surface water management system; landscaping and other ancillary development for a period up until December 2027 for Mr Matthew Hayes pdf icon PDF 767 KB

To consider the above application.

Minutes:

(Prior to consideration of the application, Councillor J Hammond left the room in accordance with the declaration he had made earlier on in the meeting.  He returned once a decision on the application had been made).

 

Consideration was given to the above application.

 

(Jack Tregoning, the agent for the applicant attended the meeting and spoke in respect of the application).

 

RESOLVED

 

That for the reasons set out in the report and in the update report to Board (as corrected orally to refer to ‘volume’ not ‘area’), the application be referred to the Secretary of State under The Town and Country Planning (Consultation) (England) Direction 2009 [as Green Belt Development] with a recommendation that the application be approved subject to the following:

 

1. Standard conditions

2. No operation of the WTS until all landfilling ceases (not including restoration

activities)

3. Cessation of WTS by 31st December 2027

4. Restricted overall throughput of 60,000tpa

5. Restrictions on processing of waste

6. All waste unloading/handling to take place within the building

7. Roller shutter doors to remain closed, aside from when in use by vehicles

8. Hours of working

9. Scheme for the control on dust

10. Restrictions on highway movements, including no more than 3 vehicles before

10am on Sundays

11. Access arrangements

12. Sheeting of vehicles

13. Submission of details of building materials

14. Noise mitigation scheme

15. Details of piling activities

16. Set noise levels

17. Scheme of noise monitoring

18. Odour mitigation scheme

19. Scheme for foul/surface water disposal

20. Control of water pollution

21. Details of lighting and restrictions on its use

22. Badger survey

23. Breeding bird survey and bird/bat mitigation

24. Safeguarding of retained habitat during construction

25. Construction environmental management plan

26. Landscape scheme (whilst building in operation)

27. Final restoration scheme (once building is removed)

 

If the application is not determined by the Secretary of State, the Planning and Place Shaping Manager is given delegated authority in consultation with the Chairman of the Strategic Planning Board to approve it subject to the conditions as specified.