To consider the above planning application
Minutes:
Consideration was given to the above application.
(Andrew Taylor attended the meeting and spoke in respect of the application).
RESOLVED
That for the reasons set out in the report the application be approved subject to the completion of a Section 106 Agreement comprising the following Heads of Terms:-
- A provision of affordable housing (the numbers and tenure split to be unaltered)
- A contribution towards local education provision of £466,390
- The provision of a LEAP, Public Open Space and footway/cycle link which should be retained in perpetuity and a scheme of management
- A commuted payment towards canal side/PROW improvements (£117,748)
- An Interim Residential travel plan in accordance with DfT guidance document
- A commuted sum for the necessary Traffic Regulation Orders, local traffic management orders and bus stops (£44,000)
And subject to the following conditions:-
1. Standard time – 3 years
2. Materials as referred to on plan H5936:04 and as referred to in section 3.0 of the Design and Access Statement
3. Submission of a landscaping scheme to be approved in writing by the LPA
4. Implementation of the approved landscaping scheme
5. Boundary treatment details as shown on plans reference H5936:06 & 423-BTD-02
6. Remove PD Rights for extensions and alterations to the approved dwellings
7. If protected species are discovered during construction works, works shall stop and an ecologist shall be contacted
8. The proposals for the incorporation of features into the scheme suitable for use by breeding birds shall be implemented
9. The proposed development to proceed in accordance with the recommendation made by the submitted Badger survey report and method statement dated October 2011.
10. The development to proceed in accordance with the approved scheme to limit the surface water run-off generated by the proposed development and the scheme to manage the risk of flooding from overland flow of surface water.
11. The hours of construction shall be limited to 08:00 – 18:00 Monday to Friday, 09:00 – 14:00 Saturday and not at all on Sundays or Bank Holidays
12. Any piling works shall be limited to 08:30 – 17:30 Monday to Friday, 09:00 – 13:00 Saturday and not at all on Sundays or Bank Holidays
13. The development shall not be occupied until the remedial/protection measures included in the reports previously submitted and approved under previous planning application numbers 10/4660C, 11/3569C and 11/3956C have been fully implemented and completed.
14. A Site Completion Report detailing the conclusions and actions taken at each stage of the works to construct each dwelling, including validation works, shall be submitted to, and approved in writing by, the Local Planning Authority prior to the first use or occupation of the dwelling to which it relates.
15. No building within 3 metres of the public sewer which crosses the site
16. Completion of the proposed off-site highway works
In the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/informatives/planning obligations or reasons for ... view the full minutes text for item 171