Consideration was given to the above
application.
RESOLVED
That the application be approved subject to the following
conditions:-
- The approval of
details relates to development for which outline permission was
granted under application reference 09/1300M dated
18.12.09. The development shall be
carried out in strict accordance with the conditions set out in the
outline planning permission, except as modified by this
permission.
Reason: For the avoidance of doubt
and to ensure that development complies with the requirements and
conditions of the outline permission and the approval of reserved
matters.
- The development
hereby approved shall commence within two years of the date of
approval of the last of the reserved matters to be
approved.
Reason: To comply with the
requirements of Sections 91 and 92 of the Town and Country Planning
Act 1990.
- The development
hereby approved shall be carried out in total accordance with the
approved plans KW/MH/EPLP/01, MH-KW-CPD-1-D, MH-KW-CPD-2,
MH-KW-CPD-3 received by the Local Planning Authority by e-mail on
30th March 2012.
Reason: For the avoidance of doubt
and to specify the plans to which the permission / consent
relates.
- Details of the
method, timing and duration of any pile driving operations
connected with the construction of the development hereby approved
shall be approved in writing by the Local Planning Authority prior
to such works taking place and shall be implemented in accordance
with the approved details.
Reason: In the interests of amenity, having regard to the
location of the site and to comply with policy DC3 of the
Macclesfield Borough Local Plan 2004.
- The surface water
drainage system of the site of the proposed works shall be designed
and constructed in accordance with drainage details which have been
submitted to and approved for the outline planning application
09/1300M, unless further details are submitted to and approved in
writing by the Local Planning Authority.
Reason: To prevent pollution of watercourses and to comply with
policy DC18 of the Macclesfield Borough Local Plan 2004.
- The hours of
construction (and associated deliveries to the site) of the
development hereby approved shall be restricted to 07.30 to 18.00
hours on Monday to Friday, 08.00 to 13.00 hours on Saturday, with
no work at any other time including Sundays and Public
Holidays.
Reason: To protect the amenity of
nearby residents and the occupiers of nearby property and to comply
with policy DC3 of the Macclesfield Borough Local Plan
2004.
- No development shall
take place until details of all external materials have been
submitted to and approved in writing by the Local Planning
Authority. Development shall be carried
out in accordance with the approved details.
Reason: To ensure that the external
appearance of the building / structure is acceptable and to comply
with policy BE1 of the Macclesfield Borough Local Plan
2004.
And subject to the following additional
condition:-
1.
(a) Prior to the
commencement of development or other operations being
undertaken on site a scheme for the protection of the retained trees produced
in accordance with BS5837 (Trees in Relation to Construction
...
view the full minutes text for item 14