Issue - meetings

11/3199M - Extension to Time Limit on Planning Permission 07/0430P (Erection of a Continuing Care Retirement Community) - Territorial Army Ypres Barracks, Chester Road, Macclesfield

Meeting: 23/11/2011 - Northern Planning Committee (Item 67)

67 11/3199M - Extension to Time Limit on Planning Permission 07/0430P (Erection of a Continuing Care Retirement Community) - Territorial Army Ypres Barracks, Chester Road, Macclesfield pdf icon PDF 396 KB

To consider the above planning application.

Minutes:

Consideration was given to the above application.

 

RESOLVED:

 

That the application be APPROVED subject to

 

(a)               Completion of a Section 106 Agreement to secure:

 

  • Amenity Open Space: to provide access and a long term landscape and habitat management plan covering the existing wetland area and the new proposed native woodlands; dealing with wildlife and protected species, management of the existing open space, establishment and management of the new amenity spaces, public access issues, a table of maintenance operations and timings and cost implications for the developer.

 

  • Use of the site for care accommodation: to be based upon Bayerton operational model document accompanying the application dated April 2007; approval of an operational plan prior to occupation dealing with facilities management, shared space and services; tenure and tenure mix including priority to local residents, care assessment, care delivery; initial and subsequent sales, rental units, care provision, care assessment, shared space and services and age restriction and continuity of care management.

 

·        Cascade provision

  • Travel Plan
  • Landscape Management Plan

(b)       The following conditions:

 

1.                                                            Provision of car parking

2.                                                            Landscaping – submission of details

3.                                                            Tree retention

4.                                                            Submission of samples of building materials

5.                                                            Submission of landscaping scheme

6.                                                            Tree protection

7.                                                            Development in accord with revised plans (unnumbered)

8.                                                            Commencement of development (3 years)

9.                                                            Landscaping (implementation)

10.                                                       Drainage and surfacing of hardstanding areas

11.                                                       Pedestrian visibility within car parks etc

12.                                                       Landscaping to include details of boundary treatment

13.                                                       Construction of junction/highways

14.                                                       Construction of highways – submission of details

15.                                                       Protection from noise during construction (hours of construction)

16.                                                       Protection of highway from mud and debris

17.                                                       Submission of construction method statement

18.                                                       Scheme for wetland

19.                                                       Breeding birds

20.                                                       Pedestrian access ramp to be constructed

21.                                                       Upgrading cycleway/footway

22.                                                       The residential units shall be provided for care accommodation only in accordance with Class C2

23.                                                       Details of ground levels to be submitted

24.                                                       Signal controlled junction to be provided

25.                                                       Existing footway to be widened

26.                                                       Provision of cycle parking facilities

27.                                                       Disposal of foul and surface waters to be approved before commencement

28.                                                       All finished floor levels shall be set at144.35 metres above Ordnance Datum

29.                                                       Renewable energy

30.                                                       Lighting scheme for access roads and all external lighting within site

31.                                                       Waste audit, including bin storage details

32.                                                       Surface water drainage

33.                                                       Details of drains

34.                                                       No gates or other means of obstruction shall be erected across the access road

35.                                                       Details of access road to be submitted

36.                                                       Existing bus stops to be upgraded

37.                                                       Details of retaining wall to be submitted

38.                                                       Oil storage

39.                                                       Shower/Changing provision