To consider the above planning application.
Minutes:
Note: Mr A Palin and Mr B Moore (objectors) and Mr C Kershaw (on behalf of the applicant) attended the meeting and addressed the Committee on this matter.
The Committee considered a report regarding the above planning application, a written update, an oral update and an oral report of the site inspection by the Principal Planning Officer.
RESOLVED – That the application be APPROVED subject to:
(a) the completion of a Section 106 agreement to secure
1. Provision of on-site affordable housing of 6 dwellings, including 4 units (3 x 2 bed and 1 x 3 bed) for rent and 2 units (2 x 3 bed) for intermediate tenure;
2. Provision of a financial contribution of £15,000 towards off site equipped play space;
3. Maintenance of areas of Public Open Space and Newt Mitigation Land
(b) the following conditions:
1) Commencement of Development (3 years)
2) Approved Plans
3) Materials to be submitted
4) Surfacing materials, including permeable driveways, to be submitted
5) Detailed Landscaping Scheme to be submitted
6) Landscaping Scheme Implementation
7) Tree protection measures to be submitted
8) Details of no dig technique and construction method to be submitted
9) Details of Boundary treatment to be submitted
10) Details of Pond to be provided on land to south of railway including construction methods
11) Details of boundary treatment to newt mitigation area to be submitted and retained
12) Details of newt holes in fence to be submitted and retained
13) Development to be carried out outside Bird Breeding Season (unless survey carried out)
14) Details of bird/bat enhancement measures
15) Parking to be available prior to occupation
16) Full detail of noise mitigation measures to be submitted including the position/design of any acoustic fencing
17) Hours of construction
18) Hours of pile driving
19) Hours of floor floating
20) Phase II Contaminated Land Survey
21) Removal of Permitted Development Rights for Extensions (Class A and B)
22) Details of foul and surface water drainage, including improvement/enhancement of existing water courses
23) Development to be carried out in compliance with the dust mitigation measures identified within Section 6 of the Air Quality Assessment prepared by SLR dated October 2011