Issue - meetings

11/0627C Smallwood Storage Ltd, Moss End Farm, Moss End Lane, Smallwood, Sandbach, CW11 2XQ: Demolition of Existing Buildings and Erection of 15 Dwellings and Associated Infrastructure Works for Smallwood Storage Ltd

Meeting: 13/07/2011 - Southern Planning Committee (Item 28)

28 11/0627C Smallwood Storage Ltd, Moss End Farm, Moss End Lane, Smallwood, Sandbach, CW11 2XQ: Demolition of Existing Buildings and Erection of 15 Dwellings and Associated Infrastructure Works for Smallwood Storage Ltd pdf icon PDF 491 KB

To consider the above planning application.

Minutes:

Note:Mr S Goodwin (Agent on behalf of the Applicant) attended the meeting and addressed the Committee on this matter.

 

The Committee considered a report regarding the above planning application and an oral report of the site inspection.

 

RESOLVED – That the Head of Planning and Housing be granted delegated authority to APPROVE, subject to no objection being received from the Greenspaces Officer.

 

Approval to be subject to the prior completion of a Section 106 agreement to secure £239,400 towards affordable housing provision in the Congleton Rural area

 

and the following conditions:

 

1.                  Standard time limit

2.                  Reserved Matters time limit

3.                  Reserved Matters (scale, appearance, landscaping)

4.                  Plans (& Scale Parameters)

5.                  Materials

6.                  Landscaping

7.                  Implementation of Landscaping

8.                  Boundary Treatment

9.                  Tree Protection Measures & Arboricultural Method Statement.

10.             Implementation of Tree Protection

11.             Removal of Permitted Development Rights

12.              Contaminated Land Condition

13.             Construction of Access.

14.             Provision of parking

15.             Development shall be restricted to 08:00 to 18:00 hours on Monday to Friday, 08:00 to 13:00 hours on Saturday, with no work at any other time including Sundays and Public Holidays.Details of piling to be submitted

16.             Timing of works to avoid bird nesting season

17.             Provision of bat roost

18.             method statement covering mitigation for great crested newt as outlined in the supporting Phase 1 Habitats Survey Report

19.              Accommodation of the public footpath.

20.              Submission of scheme to limit the surface water run-off generated by the proposed development, 

21.             .The discharge of surface water from the proposed development to mimic that which discharges from the existing site. Attenuation will be required for discharges up to the 1% annual probability event, including allowances for climate change.

22.             Provision of SUDS

23.             Submission of a scheme to manage the risk of flooding from overland flow of surface water, 

24.             site layout is to be designed to contain any such flooding within the site,

25.             Submission of a scheme to treat and remove suspended solids from surface water run-off during construction works

26.             Submission of a scheme to dispose of foul drainage

27.             No commencement of development until Smallwood Storage has relocated within the Borough.