To consider the above application.
Minutes:
(During consideration of the application Councillor J Wray arrived to the meeting).
Consideration was given to the above application.
It was noted that at the top ofpage 31 of the officer report it stated that a commuted payment was required for the construction of a pedestrian/cycle link at the rear of the Cheshire Cheese Public House. This was incorrect. The S106 agreement required the owner to form this length of pedestrian / cycle route and no commuted payment was to be made for this route. Other off site improvements and works required commuted payments to be made.
(Mr Wild, a representative of Basford East Basford West Action Group, Mr Tittensor, an objector and Mr Rolinson, the agent for the applicant attended the meeting and spoke in respect of the application.
RESOLVED
That the application be approved subject to the completion and signing of a deed of variation to implement the Habitat Management Plan for the planting on both sides of the spine road including the planting around the water storage ponds and to provide an appendix to secure a management and maintenance regime for the public art, street furniture including seating, fencing, access gates, barriers or other means of control, litter picking, control of dog waste, litter bins, dog waste bins, hard surfaces including paths and any related waymarking and maintenance of ponds and subject to Schedule 5 Part III of the S106 Agreement to be varied in respect of the pedestrian cycle link at the rear of the Cheshire Cheese and subject to the following conditions:-
1. Plans
2.Implementation of amended landscaping (as amended following negotiations)
3. Fencing to side of pedestrian cycle link in the vicinity of mitigation ponds.
4. Fencing to Great Crested Newt Mitigation ponds in southern boundary scheme.
5. Implementation of scheme for control and storage of surface water prior to the occupation of any building on the site, excluding substation and bat barn.
6. Oil interceptors to hardstandings.
7. Site to be drained on separate system with only foul drainage connected to foul sewer at the Cheshire Cheese.
8. Any discharges from yard areas which are contaminated by spillage should be connected to the foul sewer.
9. Permission for contouring of the land in accordance with the submitted details.
10. Samples of surface materials for use on paths in water storage areas and along southern boundary scheme.
11. Lighting strategy to be used to inform lighting proposals at each individual plot. Details of lighting at each plot including a lighting contour plan to be submitted with all application for new buildings.
12. Implementation of tree protection measures.
13. Implementation of Landscape Design Statement to inform landscaping of future plots.
14. Timetable and strategy for the delivery of the public art strategy including street furniture within the landscaped water holding areas east of the spine road to be submitted approved and implemented.
15. Samples of fencing material.
16. Framework construction management plan to be used as principles for construction management plans for whole site.
17. Construction Management Plan for highway works including formation of mounds to be submitted approved and implemented.
18. Construction Management Plan for phase 1 development to be submitted approved and implemented.
19. Construction of spine road and its western connection shall be completed and available for use prior to the occupation of any development on the plots.
20. Scheme for temporary highway signage as required by Section 2.3 Framework Construction Plan to be submitted approved and implemented prior to the commencement of development.
21. Closure of the exiting line of Crewe Road to all traffic except statutory undertakers/service providers for maintenance purposes only.
22. Implementation of Ecological Summary Document to whole Basford West development site.
23. Hours of working 08:00 to 17:30 Monday-Friday, any variation of hours to be agreed in writing-(Officers to inform Ward Councillors and Parish Councillors of any variation to the hours operation during construction)
In addition it was agreed that (A) authority be delegated to the Head of Planning and Policy in consultation with the Chairman and Vice Chairman to secure an increase in the percentage mix of evergreen planting in the landscaping scheme and that (B) authority be delegated to the Head of Planning and Policy in consultation with the Chairman and Vice Chairman and in consultation with the Highways Engineer to further consider the routing of the footpath link.
Supporting documents: