Agenda item

21/3438M - LAND TO THE EAST OF ALDERLEY ROAD, WILMSLOW, CHESHIRE: Outline planning permission for residential development together with associated infrastructure and open space, with all matters reserved except for means of access off Alderley Road and highway improvements to Alderley Road

To consider the planning application.

Minutes:

Consideration was given to the above application.

 

(Councillor D Jefferay, (Ward Councillor), Councillor J Newell (Wilmslow Town Council), Mr I Shepherd (Objector), and Mr P Grant (Agent) attended the meeting and spoke in respect of the application).

 

RESOLVED

 

That for the reasons set out in the report and the verbal update the application be delegated to the Head of Planning in consultation with the Chair of Strategic Planning Board (or in their absence the vice chair) to APPROVE, subject to the exploration of a more localised location for off-site Biodiversity Net Gain mitigation and the completion of  a S106 agreement to secure the following:

 

 

S106

Amount

Trigger

Traffic Regulation Order (TRO) for a 20mph speed limit

£20,000 contribution towards a

Traffic Regulation Order (TRO) for a 20mph speed limit

Prior to first occupation

 

Affordable Housing – on-site provision

 

30% of total number of dwellings

Provided no later than the occupation of 50% of the open market dwellings

Public Open Space, Recreation and Outdoor Sports & Indoor Sport – Commuted sum and on-site provision

 

Indoor Sport commuted sum - Amount to be determined based on standard formula and by number of dwellings that ultimately gain approval

 

Provision of an ‘Open Space Scheme’ which secures the necessary on-site provision

 

 

Open Space Management Plan

 

 

 

The requirement to transfer allocated ‘playing pitch’ and associated mechanism.

 

If not transferred/gifted:

 

Provision of £1,000 per market dwelling towards off-site Recreation Open Space (ROS)

 

Prior to occupation of any dwellings

 

 

 

Open Space Scheme - Prior to commencement

 

Prior to occupation of any dwellings

 

Prior to occupation of any dwellings

 

 

 

Prior to occupation of any dwellings

 

Education – Commuted sum

Amount to be determined based on standard formula and by number of dwellings that ultimately gain approval

Prior to occupation of any of the development

Health – Commuted sum

Amount to be determined based on standard formula and by number of dwellings that ultimately gain approval

Prior to occupation of any of the development

Ecology & Landscape – to secure habitat creation, management and monitoring

Submission & implementation requirement to provide:

 

-       Habitat Creation Method Statement

-       30-year habitat & Landscape management plan

-       30-year ecological monitoring strategy

-       Biodiversity metric

Prior to commencement

Travel Plan Monitoring

£5,000 towards Travel Plan monitoring

Prior to occupation of any dwellings

 

 

And the following conditions:

 

1.    Outline (commencement of development)

2.    Requirement to submit Reserved Matters application

3.    Time limit on submission of Reserved Matters

4.    Approved plans

5.    Highway Improvement works – implementation

6.    Implementation of access

7.    No more than 120 dwellings

8.    Submission of a Heritage Impact Assessment with Reserved Matters

9.    Submission/approval of a scheme of archaeological work

10.Submission/approval of pedestrian and cycle signage

11.Submission/approval of details of proposed cycle/pedestrian links with Reserved Matters

12.Submission of levels details with Reserved Matters

13.Submission of earthworks details/strategy (reservation, storage, re-use and importation of soils) with reserved matters

14.Submission of earthworks details (minimum subsoil requirements) with reserved matters

15.Submission of an updated Arboricultural Impact Assessment (AIA) with reserved matters

16.Submission/approval of updated Water Vole and Otter survey

17.An 8-metre undeveloped buffer to be maintained along the ditch located on the northern boundary

18.Submission/approval of external lighting scheme which should be capped at horizon

19.Submission of proposed ponds and gully pots with reserved matters

20.Retention of retained trees and vegetation on Parameter Plan

21.Nesting birds

22.Submission/approval of an updated ‘other protected species’ survey

23.Submission/approval of a Construction Environmental Management Plan (CEMP) to include a) recommendations in table 8.1 of Environmental Statement and b) mitigation measures to prevent pollution of controlled water receptors c) dust and smoke mitigation

24.Submission of a habitat creation method statement, an ecological strategy and a 30-year adaptive habitat management plan with reserved matters

25.Submission of a strategy for biodiversity/ecological enhancement (including 200 metres of native hedgerows) with reserved matters

26.Submission/approval of a contaminated land remediation strategy

27.Submission/approval of a contaminated land verification report

28.Submission/approval of imported soil verification report

29.Works should stop if contamination is identified

30.Implementation of noise mitigation measures

31.Submission/approval of electric charging infrastructure details

32.Submission/approval of a travel plan

33.Development proceed in accordance with Flood Risk Assessment

34.Submission/approval of an overall detailed drainage strategy / design limiting the surface water run-off to 41.36 l/s, generated by the proposed development & an associated management and maintenance plan

35.Submission/approval of a surface water and foul water drainage scheme

36.Submission/approval of a sustainable drainage management and maintenance plan

37.Submission/approval of a scheme assessing the ground conditions of the land where the new playing field is proposed

38.The set-aside playing field be restricted for outdoor sport only

39.Submission of full details of the children’s play area and how the wider open space will be laid out, in addition to Green Infrastructure with reserved matters

40.Submission/approval of a Bird Hazard Management Plan

41.No solar photovoltaics be installed without prior approval

42.To restrict any proposed internal vehicular access to the south to being for buses only

 

In order to give proper effect to the Strategic Planning Board’s intent and without changing the substance of its decision, authority is delegated to the Head of Planning in consultation with the Chair (or in their absence the Vice Chair) to correct any technical slip or omission in the resolution, before issue of the decision notice.