Agenda item

19/5596C-Outline planning application with all matters reserved except for the principal means of access for the erection of a residential development (Use Class C3), employment and commercial floorspace (Use Classes B1/B2/B8/C1/D2) and a local centre (Use Classes A1/A2/A3/A4/A5/D1) with associated landscaping, drainage and other infrastructure, Land Off, Viking Way, Congleton for Richborough Estates LLP

To consider the above application.

 

Minutes:

Consideration was given to the above application.

 

(Councillor Susie Akers-Smith, the Ward Councillor, Parish Councillor Vic Brown, representing Hulme Walfield and Somerford Booth Parish Council and Jon Suckley, the agent for the applicant attended the meeting and spoke in respect of the application).

 

RESOLVED

 

That the application be approved subject to the completion of a S106 Agreement securing the following:-

 

S106

AMOUNT/REQUIREMENT

TRIGGER

Link Road contribution

£15,000 per dwelling. Minimum of £2million regardless of numbers of dwellings

•£900,000 before 1st residential occupation

•£900,000 upon occupation of 80th dwelling

•Balance of monies of all dwellings/remainder of £2 million paid upon occupation of 70% of dwellings

Toucan

£95,000

Prior to any occupation of the development

New bus service

£150,000

Upon occupation of 50th dwelling

Greenway and Dane Cycle and Pedestrian Bridge /cycling improvements

£260,000

Prior to any occupation of any dwelling on site

Greenway and Dane Cycle and Pedestrian Bridge /cycling improvements

£100,000

Prior to occupation of any development on the west side of Viking Way

Western Greenway Land

Transfer to the Council, any transfer to the Council will be free from incumbrances (other than as set out below) but for the avoidance of doubt the transfer shall:

 

i. be a transfer of the entire freehold interest of land as shown on BRJ10407-H-SK-410

ii     be free from any pre-emption or option agreement

iii.   be free from any mortgage, charge, lien or other such incumbrance

iv.   include all usual and necessary rights of way with or without vehicles

v.    be subject to rights of access to the public

vi.           reserve any usual and necessary rights to use existing services and to lay and use new services together with any rights of entry to inspect, repair, renew, cleanse and maintain the same

viii.         not require consideration in excess of one pound (£1)

No more than 10% of the dwellings

Easement to be provided

Easement over the land shown on BRJ10407-H-SK-411 to allow access to the Western Greenway Land. Any Easement to the Council will be free from incumbrances (other than as set out below) but for the avoidance of doubt the transfer shall:

 

i.    be free from any pre-emption or option agreement

ii.   be free from any mortgage, charge, lien or other such incumbrance

iii.  include all usual and necessary rights of way with or without vehicles to allow the construction of the Western Greenway and River Dane Bridge crossing.

iv.  not require consideration in excess of one pound (£1)

No more than 10% of the Dwellings

Affordable Housing

Minimum 17.5% at 80% Open Market Value with overage/claw back clause

•Not more than 50% (80% if there is a high degree of pepper potting through the site) of the open market dwellings

shall be occupied until all of the affordable

housing units have been completed and the affordable housing

scheme made ready for immediate occupation

and use.

Education

Secondary and SEN education formula

•25% of the contribution to be paid prior to

first occupation of any dwelling.

•30% of the contribution to be paid prior to occupation of 33% percentile of the dwellings

• Remaining balance of the contribution to be

paid prior to occupation of the 66% percentile of dwellings

NHS contribution

NHS formula

1 bed unit 1.4 persons £504 per 1 bed

unit

• 2 bed unit 2.0 persons £720 per 2 bed

unit

• 3 bed unit 2.8 persons £1,008 per 3 bed

•4 bed unit 3.5 persons £1,260 per 4 bed

unit

• 5 bed unit 4.8 persons £1,728 per 5 bed

unit

•33% of the contribution to be paid prior to

first occupation any dwelling

•33% of the contribution to be paid prior to

first occupation of the 50% percentile dwelling

•Remaining balance of the contribution to be

paid prior to occupation of 75% percentile dwelling

 

Outdoor Sport contribution

Outdoor Sports formula is to be written into the s106

The formula is:

 

Residential:

• £1,000 per 2+bed family dwelling

• £500 per 2+ bed (or more) Apartment

 

Commercial (over 1,000 sqm):

Use Class A1 Shops Food retail: 1

space/£300 per 14 m2

 

Non-food retail: 1 space/£300 per 20 m2

Use Class A3 Food and drink

Restaurants: 1 space/£100 per 5 m2

Fast food/Drive through 1 space £100/per

7.5 m2

 

Use Class BI Business

B1 including offices: 1 space/£300 per 30

m2

Business parks: 1 space/£300 per 35 m2

 

Use Classes B2 and B8 General industry

and Storage and distribution

1 space/£300 per 45 m2

 

Use Class C1 Hotels

1 space/£300 per bedroom

Residential

•33%  to be paid prior to first occupation of the residential development

 •33% to be paid prior to first occupation of 50% percentile dwelling

 •Remaining balance of the contribution to be

paid prior to occupation of 75% percentile dwelling

•The contribution will be paid in full prior to the first occupation of the relevant commercial use for that phase.

Indoor Sport & Recreation

Formula -

Population increase x participation rate =

additional “active population” due to the

new development

Active population / 25 x £6,500 (one fitness station)

•33% of the contribution to be paid prior to

first occupation of any dwelling

•33% of the contribution to be paid prior to

first occupation of 50% percentile dwelling •Remaining balance of the contribution to be

paid prior to occupation of 75% percentile dwelling

 

Open Space Management scheme

Management scheme for NEAP and all POS/incidental open space throughout management site

 

 

•No more than 75% of the residential development to be occupied until the open space has been provided or such other higher percentage as may be proposed by  the Owner and agreed by the Council having regard to the construction programme and health and safety only.

•Not to allow or permit occupation of the

residential development until the Management Plan has been submitted and approved by the Council.

• The NEAP will be delivered in full prior to

first occupation of 50% of the residential

development.

Residential Greenway Link

To be offered up via a S38 agreement for the Council for future maintenance. Any soft landscaping provided in the approved proposals will be required to be maintained by the Open Space Management Company

Prior to 1st residential occupation

Travel Plan Monitoring payment

£6000

Prior to occupation of 1st dwelling

Allotments

Formula -

£563.50 for each residential unit for every residential phase or sub phase

•33% of the contribution to be paid prior to

first occupation of any dwelling

•33% of the contribution to be paid prior to

first occupation of 50% percentile dwelling •Remaining balance of the contribution to be

paid prior to occupation of 75% percentile dwelling

 

Signage for pedestrians and cyclists

Scheme of signage for pedestrians and cyclists within the red line boundary and off-site shall be included within the s278 agreement

Prior to any development on site

 

 

And subject to the following conditions:-

 

1.            Standard Outline

2.            Submission of reserved matters

3.            Plans

4.         Residential travel plan inc residents information pack

5.            Development to comply with Coding within Chapter 6 of the revised Design and Access Statement and the Regulating Plan (p39 rev Design and access statement)

6.            Phasing plan covering entire site to be provided with 1st reserved matters application. The phasing plan shall secure the delivery of habitat creation/ecological mitigation throughout the River Dane corridor upon implementation of the 1st reserved matters scheme within the site.

7.            Prior to development commencing Biodiversity Net Gain scheme to be provided for area identified Blue hatch on Parameters plan. The scheme shall be completed prior to the completion of the 1st reserved matters scheme anywhere on site. Each RM’s to be supported by habitat creation/30yr habitat management plan for all created areas within that phase informed by submitted biodiversity metric

8.            Updated otter and water vole surveys

9.            Any reserved matter application to be supported by updated badger survey/impact assessment and mitigation

10.       Each reserved matters application to include proposals for the  

      creation of   compensatory hedgerow planting to address any

      hedgerows unavoidably lost.

11.         Each phase of development to have bat friendly/ecologically sensitive lighting

12.         Detailed design of surface water outfall to river Dane to be submitted with Reserved Matters (relevant phase)

13.         Submission of habitat creation, management and monitoring proposals (for a period of 30 years) with each reserved matters application informed by submitted biodiversity metric

14.         50 m buffer to River Dane

15.         Drainage strategy/surface water run off

16        Groundwater monitoring scheme/westlow mere

17.       Compliance with AIA/trees identified as bat roost potential in ES to be retained

18.       Tree/Hedge protection for each phase

19        Programme of archaeological work

20        Scheme of signage for pedestrians and cyclists within the red line boundary

21        A scheme for the provision of Street lighting (To cover as a minimum from the end of the existing lighting installed on Barn Road to cover up to the new residential development access) 

22        A scheme for the provision of a right-turn lane facility shall be submitted as part of the Reserved Matters application for the proposed superstore parcel of the site.

23        Full details inc Street Lighting of the proposed Greenway Link as shown on the illustrative residential parcel masterplan.

24        The proposed residential Greenway Link will be built to adopted highway standards (including any structural retaining walls / earthworks that may be required) shall be provided prior to the occupation of the 50th dwelling

25        Prior to the occupation of any of the residential properties a Scheme for the provision of a Bus Layby and bus shelter on the northbound side of Barn Road as detailed in the Illustrative Layout shall be submitted for approval. This layby shall be delivered prior to the Occupation of 50 dwellings.

26.       Prior to the occupation of any of the residential properties a Scheme for the provision of a ‘on carriageway’ Bus Waiting facility on the southbound side of Barn Road, including raised kerbs, road markings and bus shelter shall be submitted for approval. This Bus Stop facility shall be delivered prior to the Occupation of 50 dwellings.

27.       Prior to any development on the West side of the Barn Road development a Scheme shall be submitted for approval for the provision of a minimum 2.0m wide footpath adjacent to Barn Road (limited to within the extents of the development) and this implemented prior to any occupation.

28        Noise Impact Assessment tbs with reserved matters to achieve Dba at residential properties

29        A scheme of odour abatement / control / mitigation shall be submitted for each phase of commercial development

30        Electric Vehicle Infrastructure – for all land uses proposed

31        Ultra Low Emission Boilers

32        Construction and Environment Management Plan for each phase

33        Material Management Plan

34        Contamination each phase - Residential

35        Contamination commercial each phase

36        Soil importation – whole site

37        Verification Report for each phase approved prior to occupation of that phase

38        Unforeseen contamination – whole site

39        Existing/proposed/FFL Levels for each phase

40        Superfast broadband provision

41        Scheme for the incorporation of electromagnetic screening measures(protection of Jodrell Bank telescope)

42        Removal pd for extensions - Class E uses only (Part 7 GPDO) /no mezzanine floors to be developed for discount foodstore/parade of 3 shops and café unit

43        Discount food store – limit to 1,900 sq m gross (GIA). To comprise 1,300 sq m net floorspace of which 80% (1,040sq m net) would be for convenience retail floorspace and 20% (260sq m net) would be for comparison goods floorspace.

44        The café unit hereby permitted shall not exceed 303 sqm (GIA) and shall be used for use class E(b) the sale of food and drink for consumption (mostly) on the premises

45        The 3 no small retail  units shall not  be operated for a use that falls  within Use Class E(a) and E(g)  of the Use Classes Order (as amended) and shall have cumulative floor area no larger than   488sq m gross (maximum) in total. The 3 units shall be separate from each other and not amalgamated into

46        EMPLOYMENT AREA - limited to Use Class E(g)(i) (Offices), E(g)(ii) (Research and Development) and E(g)(iii) (Industrial Processes), B2 (general industry), B8 (storage or distribution)

47        site waste management to be provided prior to any commercial floor space being occupied

48        Commercial development – non centralised low carbon energy

49        Max residential =  175 units

50        Scheme of public art to greenway

52        Ecological enhancement (bat and bird boxes) to be submitted with each reserved matters

53        Landscape/public realm/habitat management plans should be for a minimum period of 25 years

54        Construction and Management Plan dealing with noise/pollution impacts upon adjacent wildlife site

 

In addition it was requested that there be an informative included with the

Conditions stating that focus should be on the greenway, cycling and walking routes and the design which would enhance the experience of residents of Congleton and the local area.

In the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/informatives/planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Planning  has delegated authority to do so in consultation with the Chairman of the Strategic Planning Board, provided that the changes do not exceed the substantive nature of the Committee’s decision.

Supporting documents: