To consider the above application.
Minutes:
Consideration was given to the above application.
(Jon Suckley, the agent for the applicant attended the virtual meeting and spoke in respect of the application).
RESOLVED
That the application be delegated to the Head of Planning in consultation with the Chairman and Vice Chairman of the Strategic Planning Board to approve subject to resolving the objections from the Environment Agency; receipt of comments from the Lead Local Flood Authority (LLFA); clarification of the electrical charging provision requirements and meeting policy SE9 on renewable energy provision and subject to the completion of a S106 Agreement securing the following:-
Highways - Contribute to the Middlewich Eastern Bypass or A54 Corridor/Leadsmithy Street corridor improvements based on a payment of £30 per sq m GIA to be paid in four instalments prior to occupation of:-
• Plot 4B phase 1;
• Plot 4B phase 2
• Plot 4B phase 3; and
• Plot 1B
And Ecology – Biodiversity offset payment as follows:-
Prior to the commencement of development a scheme for offsetting
biodiversity impacts on the site shall be submitted to and approved by the
local planning authority. The proposed offsetting scheme shall include:
• Details of the offset requirements of the development in accordance
with the current Defra biodiversity metric, which has been calculated to
comprise 8.5 units conservation credits of grassland;
• The identification of a receptor site or sites which generate a minimum
8.5 units available conservation credits;
• The provision of evidence of arrangements that secures the delivery of
the offsetting scheme;
• A management and monitoring plan (which shall include for the
provision and maintenance of such offsetting measures for a period of not
less than 25 years from commencement of development)
And subject to the following conditions:-
FULL APPLICATION:
1. 3 Year start date
2. Approved plans/documents
3. Materials
4. Landscaping
5. Landscape maintenance
6. Arboricultural Impact Assessment
7. Tree Retention/Protection
8. Levels
9. Electric vehicle infrastructure
10. Ultra Low Emission Boiler(s)
11. Importation of soils
12. Contaminated land assessment (Phase II)
13. Contaminated land verification report
14. Measures to deal with unexpected contamination
15. Foul and surface water on separate systems
16. Surface water drainage
17. Tree felling under supervision (Bats)
18. Lighting (Amenity & Bats)
19. Updated Otter survey
20. Bird nesting season
21. Ecological mitigation measures
22. 25 Year habitat management plan
23. PROW Management scheme
OUTLINE APPLICATION:
1. Outline timescales
2. Approved plans/documents
3. Materials
4. Landscaping
5. Landscape maintenance
6. Arboricultural Impact Assessment
7. Tree Retention/Protection
8. Levels
9. Electric vehicle infrastructure
10. Ultra-Low Emission Boiler(s)
11. Importation of soils
12. Contaminated land assessment (Phase II)
13. Contaminated land verification report
14. Measures to deal with unexpected contamination
15. Foul and surface water on separate systems
16. Surface water drainage
17. Tree felling under supervision (Bats)
18. Lighting (Amenity & Bats)
19. Updated Otter survey
20. Bird nesting season
21. Ecological mitigation measures
22. 25 Year habitat management plan
23. PROW Management scheme
In the event of any changes being needed to the wording of the Board’s decision (such as to delete, vary or add conditions/informatives/planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Planning has delegated authority to do so in consultation with the Chairman of the Strategic Planning Board, provided that the changes do not exceed the substantive nature of the Board’s decision.