To consider the above application.
Minutes:
Note: Councillor James Nicholas (Ward Councillor), Liz Thomas (objector) and Rawdon Gascoigne (on behalf of the applicant) attended the meeting and addressed the Committee on this matter.
The Committee considered a report regarding the above planning application, a written update and an oral report of the site inspection.
RESOLVED
(a) That, for the reasons set out in the report and the written update, the application be APPROVED subject to the completion of a S106 Agreement to secure:
S106 |
Amount |
Triggers |
Affordable Housing
|
30% (10 units) (65% Affordable Rent / 35% Intermediate) |
No more than 80% open market occupied prior to affordable provision
|
Education
|
Primary 0 Secondary 5 £81,713 Total education contribution: £81,713 |
50% Prior to first occupation 50% at occupation of 17th dwelling |
Public Open Space inc play, amenity greenspace, ecological, riverside walkway & buffer areas.
|
Management Co. for on-site open space £34,000 towards works of addition, improvement and enhancement to the sports pitches, courts and greens at Bollington Recreation Ground and within the period of 15 years from receipt. |
On first occupation
|
and the following conditions:
1. Commencement of development (3 years)
2. Development in accordance with approved and amended plans
3. Removal of permitted development rights for Classes A-E
4. Construction of access prior to first occupation
5. Landscaping - submission of details and to include retention of west boundary hedge
where possible and planting with native species
6. Landscaping (implementation)
7. Protection for breeding birds during bird nesting season
8. Submission of landscape management plan
9. Details of ground levels to be submitted including cut and fill
10. Nesting bird mitigation measures
11. Notwithstanding submitted detail, details of boundary treatments to be submitted and approved (to exclude the provision of any gate to the main access)
12. Details of proposed noise fence to be submitted and approved
13. Should any contamination be found, a remediation strategy shall be submitted to the EA
14. Features for roosting bats to be incorporated into housing
15. Method statement for the safeguarding of the river corridor and associated habitats during the construction process.
16. Submission of an ecological enhancement management strategy including proposals for the eradication of Himalayan Balsam
17. Submission of updated badger survey prior to commencement of development.
18. Details of pile foundations to be submitted and approved
19. Electric Vehicle Infrastructure to be provided at each property with private driveway
20. Scheme of dust control to be submitted and approved
21. Contaminated Land Survey to be submitted and approved
22. Development to be carried out in accordance with Flood Risk Assessment
23. Finished floor levels of habitable dwellings shall be set 600 mm above the modelled 1 in 100 annual probability (plus a 30% allowance for climate change) flood level.
24. The development hereby permitted shall not commence until details of the detailed design, implementation, maintenance and management of a surface water drainage scheme have been submitted
25. A scheme for the management of overland flow from surcharging of the site's surface water drainage system during extreme rainfall events to be submitted and approved
26. Detailed design and associated management and maintenance plan of surface water drainage for the site using sustainable drainage methods to be submitted to be submitted and approved
27. Surface water must drain separate from the foul and no surface water will be permitted to discharge directly or indirectly into existing public sewerage systems
28. Details of facing, roofing and surfacing materials to be submitted and approved
29. Scheme of Tree Protection to be submitted and approved
30. Tree Pruning/Felling Specification to be submitted and approved
31. Construction Management Plan to be submitted
32. Standard broadband condition
33. Details of bin stores to be submitted
34. Scheme of play equipment to be submitted, approved and implemented.
35. Noise mitigation measures inc mechanical ventilation for the houses nearest to the Mill to be submitted / implemented
(b) That, in order to give proper effect to the Committee`s intent and without changing the substance of its decision, authority be delegated to the Head of Development Management following consultation with the Chairman (or in their absence the Vice Chairman) to correct any technical slip or omission in the resolution, before issue of the decision notice or in the event of an appeal.