Agenda item

17/6233C Land Off Wheelock Street, Middlewich, Cheshire: Full planning application for the demolition of existing buildings and the erection of 35no. dwellings, a retirement living facility containing 50no. apartments and 3no. retail units for C/O Agent, Henderson Homes (UK) Ltd and McCarthy and Stone

To consider the above planning application.

Minutes:

Note: Chris Butt attended the meeting and addressed the Committee on behalf of the applicant.

 

The Committee considered a report regarding the above planning application and a written update.

 

(a)  That, for the reasons set out in the report and the written update, the application be APPROVED subject to the completion of a S106 Agreement to secure:

 

S106

Amount

Triggers

50% discount for sale units

 2 x 1 bed flat

2 x 2 bed house (both  in Henderson part of site) Discount for Sale percentage TBC.

 

In event of no agreement to the above , £223,591 commuted sum in lieu

50% upon 1st occupation of the 20th unit. 50% at occupation of the    30th  unit

Health

 

 

£60,696

 

50% Prior to first occupation of any part of the development

50% at occupation of  the 43rd unit

Education

 

£81,713

 

50% Prior to first occupation of any house within the Henderson scheme

50% at occupation of the 18th dwelling.

 

Retention of retail units to Wheelock St for retail uses (A1 to A5)

 

 

 

 

Upon 1st occupation of any part of the McCarthy and Stone development

Private Management scheme for all POS/incidental open spce on site.

 

Occupation of 17th house within the Henderson scheme or 1st occupation of McCarthy element whichever comes 1st

TRO for loading bay on Wheelock ST

£10,000

Commencement of the McCarthy development

 

and the following conditions:

 

1. Standard Time

2. Plans

3. Tree Protection

4. Tree Pruning/Felling Specification

5. Service/Drainage Layout to be submitted

6. Pedestrian link through site from Southway to Darlington Street to be un-gated and re-routed through McCarthy & Stone car park

7. Prior to the use of any facing or roofing materials details/ samples shall be submitted and approved

8. Notwithstanding the approved plans boundary treatment details shall be submitted and approved prior to commencement

9. Submission, approval and implementation of a Construction/Environment Management Plan (to include construction vehicle route) - prior to commencement

10.  Arboricultural Management Scheme – prior to commencement

11.Site specific  Engineer designed specifications for any foundation or area of hard surfacing within the root protection area of retained trees have been submitted to and approved- prior to commencement

12. Existing/proposed and Finished Floor Levels to be submitted and approved prior to commencement

13. Provision of Electric Vehicle infrastructure

14. Contaminated land – submission of a phase 2 report - prior to commencement

15. Contaminated land – submission of a verification report

16. Contaminated land – works to stop if any unexpected contamination is discovered on site

17. Contaminated land imported garden soil

17. Breeding birds – mitigation measures

18. Breeding Birds – timing of works

19. Submission of external lighting details

20.In respect of the dwellings - Removal of permitted development rights for all extensions/outbuildingsClass(es) A-E of Part 1 and  fence/ any means of enclosure forward of any building line Class B of Part 2  Schedule 2 of the Order

21. Piling

22. Notwithstanding submitted plans details of the hard and soft landscaping and car parking layouts to be submitted and approved

23. Implementation of the landscaping scheme

24. The car-parking layout approved as part of condition 22 shall be implemented prior to first occupation

25. Development to be undertaken in accordance with submitted Bat Mitigation Strategy prepared by SLR dated January 2019 unless varied by a subsequent Natural England license

26.Residents’ Sustainable Travel Information Pack

27.Programme of archaeological work

28.Detailed design and associated management and maintenance plan of surface water drainage (SUDS)

29. Windows on side elevation overlooking 2 Darlington St to be obscured/not opening

30. Notwithstanding submitted plans a landscaping, including replacement tree planting scheme to be submitted/implemented

31. Retail uses scheme of services

32. Retirement living occupation age restriction

33. Dropped kerb and closure to Wheelock Street

 

(b) That, in order to give proper effect to the Committee’s intentions and without changing the substance of the decision, authority be delegated to the Head of Planning (Regulation), in consultation with the Chairman (or in his absence the Vice Chairman) of Southern Planning Committee, to correct any technical slip or omission in the wording of the resolution, before issue of the decision notice.

 

(c)     That, should this application be subject to an appeal, approval be given to enter into a S106 Agreement with the following Heads of Terms:

 

S106

Amount

Triggers

50% discount for sale units

2 x 1 bed flat

2 x 2 bed house (both  in Henderson part of site) Discount for Sale percentage TBC.

 

In event of no agreement to the above , £223,591 commuted sum in lieu

50% upon 1st occupation of the 20th unit. 50% at occupation of the    30th  unit

Health

 

 

£60,696

 

50% Prior to first occupation of any part of the development

50% at occupation of  the 43rd unit

Education

 

£81,713

 

50% Prior to first occupation of any house within the Henderson scheme

50% at occupation of the 18th dwelling.

 

Retention of retail units to Wheelock St for retail uses (A1 to A5)

 

 

 

 

Upon 1st occupation of any part of the McCarthy and Stone development

Private Management scheme for all POS/incidental open space on site.

 

Occupation of 17th house within the Henderson scheme or 1st occupation of McCarthy element whichever comes 1st

TRO for loading bay on Wheelock ST

£10,000

Commencement of the McCarthy development

 

 

Supporting documents: