To consider the above application.
Minutes:
Consideration was given to the above application.
(Councillor H Gaddum, the Ward Councillor, Pater Yates, representing Sutton Parish Council and Andrew Wintersgill, representing the applicant attended the meeting and spoke in respect of the application).
RESOLVED
That for the reasons set out in the report the application be approved subject to the completion of a Section 106 Agreement securing the following:-
S106 |
Amount |
Triggers |
Affordable Housing
|
30% (65% Affordable Rent / 35% Intermediate)
|
In accordance with phasing plan. No more than 80% open market occupied prior to affordable provision in each phase.
|
Education
|
Primary £672,470 Secondary £800,792 SEN £182,000 (Macclesfield Academy or new school) |
50% Prior to first occupation 50% at occupation of 51st dwelling |
Health
|
£332, 640 (Waters Green Medical Centre / development of additional primary care premises within Macclesfield) (average – based on occupancy)
|
50% Prior to first occupation 50% at occupation of 51st dwelling |
Indoor recreation
|
£58,500 (Macclesfield Leisure Centre)
|
Prior to first occupation |
Recreation Open Space
|
(£1000 per market dwelling and £500 per 1 / 2 bed market apartment) (Key Centre at Congleton Road Playing Fields to help deliver a 3G pitch, improve and reorganise retained grass pitches and provide a new pavilion with changing, community room and health and fitness offer) |
On occupation of 51st dwelling |
Public Open Space
|
Private Management Company for Allotments and other Areas of Open Space or transferred to the Council. Provision of a LEAP on site Provision of commuted sum in lieu of LAP towards Robin Lane Play Area (£75 per sqm of shortfall in on site provision) or provision of LAP on site |
On first occupation
On occupation of 51st dwelling |
Highways Contribution
|
£2,200 per unit (towards infrastructure improvements in the Macclesfield Movement Strategy) |
On commencement of development |
And subject to the following conditions:-
1. Standard Outline Time limit – 3 years
2. Submission of Reserved Matters
3. Development to be limited to a maximum of 310 units
4. Access to be constructed in accordance with approved plan prior to first occupation
5. Toucan crossing on London Road to be provided prior to first occupation
6. Reserved matters application/s to include the provision of a buffer and / or bund round the perimeter of Lyme Green Depot
7. Accordance with submitted Travel Plan
8. Provision of electric vehicle infrastructure (charging points) at each property with private off road parking prior to first occupation
9. Construction Environmental Management Plan submitted, approved and implemented
10. Scheme of Piling works to be submitted, approved and implemented
11. Submission of a Phase II contaminated land survey
12. Remediation of contaminated land
13. Submission of soil verification report prior to first occupation of units to which they relate
14. Dust control scheme to be submitted, approved and implemented
15. Development to be carried out in accordance with submitted Flood Risk Assessment
16. Scheme of foul and surface water drainage to be submitted, approved and implemented. Foul and surface water drainage shall be connected on separate systems
17. Submission of a detailed drainage strategy / design, associated management / maintenance plan
18. Reserved matters application to be supported by structural information should any works be carried out within 15 metres of the canal side
19. Accordance with submitted Ecological Assessments
20. Reserved matters application/s to be supported by a strategy for the incorporation of features to enhance the biodiversity value of the proposed development (in accordance with outline) and to mitigate and compensate for any adverse effects arising from the development.
21. Long term habitat management plan to be submitted, approved and implemented
22. Reserved matters shall include the retention of wet woodland at Target Note 9
23. Reserved matters shall include details of the provision of marshy drainage feature for Snipe
24. Reserved matters application to be supported by an updated Badger Survey, and Bat and Barn Owl Survey
25. Submission and approval of a written scheme of investigation for the implementation of a programme of archaeological work
26. The drainage scheme must not discharge any water from the road network or parking area in any new or retained ponds or the existing ditch network
27. Noise survey and mitigation scheme to be submitted with the application/s for reserved matters
28. Detailed lighting scheme to be submitted in support any future reserved matters application
29. Reserved matters to be supported by detailed finished ground and floor levels
30. Nesting Birds Survey to be carried if works are to be carried out during the bird breeding season
31. Proposals for the incorporation of features into the scheme suitable for use by nesting birds to be submitted, approved and implemented
32. Reserved matters application to be supported by an updated Arboricultural Impact Assessment, Tree Protection Plan and Method Statement
33. Reserved matters to include a signage scheme directing users to local cycle and footpath routes
34. Details of boundary treatments to submitted with reserved matters (including detail of treatment with Rayswood nature Reserve)
35 Two lane exit from access to London Road
36 Reserved Matters to include access to adjacent site
37 Reserved Matters to include footpath links and access to POS
In the event of any changes being needed to the wording of the Board decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Planning (Regulation) delegated authority to do so in consultation with the Chairman of the Strategic Planning Board, provided that the changes do not exceed the substantive nature of the Board’s decision.
(Councillor S Hogben left the meeting and did not return).
Supporting documents: