Agenda item

17/4011N-Hybrid Planning Application for-Outline planning application (with all matters reserved except for means of access and layout for Production and Manufacturing Facility 2) for the erection of 2 no. production and manufacturing facilities; two covered links connecting one of the production and manufacturing facilities with Bentley's existing manufacturing facility; an engine test bed facility together with associated car parking, landscaping and associated infrastructure. Full planning application for the erection of a gatehouse, security fencing, pedestrian turnstile and associated turning facilities to the west of the existing Bentley Motors site on Pyms Lane; the erection of a gatehouse, security fence, pedestrian turnstile, bin store, reconfiguration of visitor parking and associated turning facilities to the east of the existing Bentley Motors site on Pyms Lane; the erection of a gatehouse, security fence, cycle store, pedestrian turnstile and associated turning facilities

To consider the above application.

Minutes:

Consideration was given to the above application.

 

(Councillor B Roberts , the Ward Councillor and Jon Suckley, the agent for the applicant attended the meeting and spoke in respect of the application).

 

RESOLVED

 

That for the reasons set out in the report the application be approved subject to the completion of a Section 106 Agreement securing the following:-

 

           Financial contribution of £10,000 for Travel Plan Monitoring.

 

And subject to the following conditions:-

 

1.         Standard 3 year time limit (Full Planning Details – Road Closure,    gatehouses and associated works)

2.         Standard outline time limit (Outline Details – Manufacturing and Production Buildings and Car Parks)

3.         Submission of reserved matters (for Manufacturing and Production Buildings and Car Parks)

4.         Accordance with approved plans

5.         Materials to be submitted and approved

6.         Development to be carried out in accordance with submitted noise impact assessment

7.         Reserved matters to include a noise mitigation scheme

8.         Reserved matters shall not exceed the floorspaces specified in this application

9.         Further details of any fixed plant / noise generative equipment to be submitted and approved

10.       Submission, approval and implantation of an Environmental Management Plan

11.       Additional Phase II Land contamination investigations and assessments to be submitted and approved

12.       Development to be carried out in accordance with submitted ecological surveys

13.       Survey for nesting birds if works carried out during nesting season

14.       Scheme to incorporate features suitable for breeding birds

15.       Development to be carried out in accordance with submitted Flood Risk Assessment

16.       Submission of a sustainable drainage management and maintenance plan / scheme

17.       Details of foul water drainage to be submitted

18.       Surface water drainage strategy to be submitted

19.       Landscape scheme to be submitted with reserved matters and shall include retention of woodland planting in Target 11 as far is practicable or scheme for its replacement where there are losses

20.       Tree and hedgerow protection scheme to be submitted with reserved matters

21.       Piling method statement

22.       Details of external lighting to be submitted and approved

23.       Details of cycle parking to be submitted and approved

24.       Travel Plan to be submitted and approved and shall include provision of an updated  target on reducing single occupancy car trips over the forthcoming 5 year period and the provision of cycle and bus travel vouchers for staff (up to the value of £150)

25.       No development to commence until details of a scheme to facilitate the flow of traffic along Minshull New Road north of its junction with Badger Avenue and the improvement at the West Street/Sunnybank Road junction are submitted to and approved and implemented prior to the closure of Pyms Lane and Sunnybank Road to through vehicular traffic and be retained for the life of the development.

26.       Submission of a construction management plan to include:

           A construction phasing plan.

           A routing plan for construction traffic.

           Compound and parking arrangements for site operatives.

           Wheel wash facilities

27.       Scheme of dust control to be submitted

28.       Provision of electric vehicle charging infrastructure

 

Informatives to include:

 

1. Informative to include s278 agreement to facilitate the design and implementation of highway schemes along Minshull New Road and the junction of West Street/Sunnybank Road.

 

2. An application under S247 of the Town & Country Planning Act 1990 to permit the stopping up of Pym’s Lane and Sunnybank Road will need to be secured by the applicant.

 

In the event of any changes being needed to the wording of the Board's decision (such as to delete, vary or add conditions/informatives/planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Planning (Regulation) has delegated authority to do so in consultation with the Chairman of the Strategic Planning Board, provided that the changes do not exceed the substantive nature of the Board’s decision.

 

Should this application be the subject of an appeal, authority be delegated to the Head of Planning (Regulation) in consultation with the Chairman of the Strategic Planning Board to enter into a planning agreement in accordance with the S106 Town and Country Planning Act to secure the Heads of Terms for a S106 Agreement.

 

(During consideration of the application, Councillor L Wardlaw arrived to the meeting.  In accordance with the Code of Conduct she did not take part in the debate or vote on the application).