To consider the above application.
Minutes:
Consideration was given to the above application.
(Two objectors and a representative speaking on behalf of the applicant attended the meeting and spoke in respect of the application).
RESOLVED
That the application be delegated to the Head of Planning and Policy in conjunction with the Chairman to approve subject to consideration of the issues in the additional objection letter and subject to there being no new and relevant issues being raised in the objector’s letter which had not already been considered at the Committee, to approve the application subject to the following conditions:-
1. A03FP - Commencement of development (3 years)
2. A02AP - Detail on plan overridden by condition
3. A05EX - Details of materials to be submitted
4. A02LS - Submission of landscaping scheme
5. A04LS - Landscaping (implementation)
6. A10LS - Additional landscaping details required
7. A12LS - Landscaping to include details of boundary treatment
8. A23MC - Details of ground levels to be submitted
9. A02HA - Construction of access
10. A08HA - Gates set back from footway/carriageway
11. A26HA - Prevention of surface water flowing onto highways
12. A30HA - Protection of highway from mud and debris
13. A32HA - Submission of construction method statement
14. A22GR - Protection from noise during construction (hours of construction)
15. A01TR - Tree retention
16. A02TR - Tree protection
17. A04TR - Tree pruning / felling specification
18. Vehicular visibility at access (different dimensions at each side)
19. Parking provision
20. Surfacing treatment of access
21. Lighting Scheme
22. No alterations to the basement without the Council’s permission
23. Removal of Permitted Development Rights (A-E)
24. Material condition to ensure the roof is constructed of slate
25. No Pile Driving
26. Use of Geothermal heat sources in accordance with the submission
27. The planning permission to confer no use of the area of land shown on the plans.