10/1250N Erection of 9 no. detached dwellings and associated detached garaging. Refurbishment and extension of 2 no. existing dwellings (Foolpenny Hall and Crosslands Cottage) and the demolition of existing office building at The Paddock - Foolpenny

Meeting: 12/01/2011 - Southern Planning Committee (Item 135)

135 10/1250N Erection of 9 no. detached dwellings and associated detached garaging. Refurbishment and extension of 2 no. existing dwellings (Foolpenny Hall and Crosslands Cottage) and the demolition of existing office building at The Paddock - Foolpenny Hall. Formation of New Access onto London Road. Re-submission of 09/2012N, Foolpenny Hall, London Road, Stapeley for Mr. S. Williams pdf icon PDF 785 KB

To consider the above planning application.

Minutes:

Note: Mr A Gentil (objector) and Mr M Ollier (architect on behalf of the applicant) attended the meeting and addressed the Committee on this matter.

 

The Committee considered a report regarding the above planning application, an oral report of the site inspection and an oral update by the Southern Area Manager - Development Management.

 

RESOLVED – That the Head of Planning and Housing be granted delegated authority to APPROVE the application following negotiation regarding the siting of the garage on plot 2.

 

Approval to be subject to the following conditions:

 

1. Standard

2. Plans

3. Materials

4. Submission / approval / implementation of boundary treatment

5. Submission / approval / implementation of a scheme of drainage to include the following:-

a. surface water shall not be discharged to the foul / combined sewer

b. surface water discharge to the soakaway / SUDS / Pond

c. a scheme to limit the surface water run-off generated by the proposed development,

d. The discharge of surface water from the proposed development to mimic that which discharges from the existing site.

e. a scheme to manage the risk of flooding from overland flow of surface water,

6. No building over public sewer

7. Submission / approval / implementation of a landscape management plan

8. Submission / approval / implementation of a access arrangement

9. Prior to any commencement of works between 1st March and 31st August in any year, a detailed survey is required to check for nesting birds.

10. Submission / approval / implementation of features into the scheme suitable for use by roosting bats and breeding birds.

11. Submission / approval / implementation of design for retained part of pond

12. Contaminated land report

13. The hours of construction (and associated deliveries to the site) of the development shall be restricted to 08:00 to 18:00 hours on Monday to Friday, 08:00 to 13:00 hours on Saturday, with no work at any other time including Sundays and Public Holidays.

14. Submission / approval / implementation of details of any pile driving operations.

15. Submission / approval of a scheme of landscaping

16. Implementation of landscaping

17. Scheme of tree protection

18. No works within protected areas

19. Arboricultural method statement

20. Remove permitted development rights.