To consider the above application.
Minutes:
Consideration was given to the above application.
RESOLVED
That the application be approved subject to the following conditions:-
1. Standard conditions
2. Approved plans
3. Boundary treatment scheme submitted within 1 month and implemented within 3 months and planted in the next available planting season;
4. Noise limits set
5. Noise mitigation scheme submitted for approval
6. Bio-aerosol best practice, mitigation and monitoring as per risk assessment
7. Odour management and best practice as per application
8. Dust monitoring, control and best practice as per application
9. Open windrows stockpile heights limited to no more than 3 metres height bars provided
10. Recyclable waste material stockpiles reduced to 4 metres in height within 3 months of the date of the permission and maintained at a maximum of 4 metres throughout the life of the development
11. Stacked skips limited to 4 metres in height
12. Drainage
13. Waste/materials stated in the application only permitted
14. Standard compost conditions detailing waste types in accordance with the 15. EA permit excluding putrescible and food waste
16. No burning of wastes on site
17. Hours of operation as stated with the application
18. Waste treatment and storage shall only take place on the concreted areas of the site
19. Standard operational conditions
20. Limits on volume of material as stated within the planning application.
The following informatives should be attached to any decision notice.
Highways
The applicant will need to obtain the consent of the highways authority (CEC) for any work in, or that may affect the public highway. The applicant should contact Crewe area office (CEC) before constructing or altering any access. This work should be carried out under a section 184 licence.
Any new access or alterations to an existing access must be approved by the LPA prior to development and constructed in accordance with the approved drawings and to CEC specification. Any new gates shouldopen inwards and be set back from the edge of the highway to allow the largest of vehicles using this site to park off highway.
United Utilities
Should this planning application be approved, the applicant should contact our Service Enquiries on 0845 7462200 regarding connection to the water mains/public sewers
United Utilities offers a fully supported mapping service at a modest cost for our electricity, water mains and sewerage assets. This is a service, which is constantly updated by our Map Services Team (Tel No: 0870 7510101) and I recommend that the applicant give early consideration in project design as it is better value than traditional methods of data gathering. It is, however, the applicant's responsibility to demonstrate the exact relationship on site between any assets that may cross the site and any proposed development.
Environment Agency
This development will require an Environmental Permit under the Environmental Permitting Regulations 2007 from the Environment Agency, unless an exemption applies.
The Duty of Care regulations for dealing with waste materials are applicable for any off-site movements of wastes. It should be ensured that all materials removed go ... view the full minutes text for item 6