Decision Maker: Strategic Planning Board
Decision status: For Determination
Is Key decision?: No
Is subject to call in?: No
Consideration was given to the above application.
(Mr I Melville attended the meeting and spoke in respect of the application).
RESOLVED
That the application be approved subject to a legal agreement to secure:
The provision of on site open space and equipped children’s playspace in accordance with Policy RT.3 of the Local Plan with any shortfall in provision to be made up by way of a developer contribution in lieu of public open space calculated at £1000 per house (index linked).
The affordable housing provision, to include a requirement that 35% of the total provision shall be affordable, 23% shall be social rented housing and 12% shall be shared ownership.
Details of phasing of development to include, inter alia, provision of the pedestrian / cycle link within the first phase of development.
A scheme of public art to be agreed for the site;
and subject to the following conditions:-
1-3 Standard Outline
4 Maximum floor area for retail food development 1,329sqm
5 Maximum food area for retail non-food comparison 2,787sqm and remainder bulky goods
6 Footway/cycleway details as part of first reserved matters application
7 Noise mitigation measures to dwellings to include glazing
8 No Development within 8m of side walls of culvert
9 Flood Risk Assessment Mitigation Measures
10 Air Quality Assessment Mitigation Measures
11 Provision of Right Turn off Mill Street – timing to be agreed
12 Design Concept to be high quality and inclusive design, and shall have regard to the principles set out in the adopted SPD and shall include an element of Traditional 19th Century Railway Housing
13 No further sub-division of retail units.
14 Contaminated Land
15 Sustainable Urban Drainage Systems as part of Reserved Matters
16 Incorporation of sustainable features as part of Reserved Matters
17 Waste Management Plan to be submitted
18 Signage to Town Centre and Heritage Centre
19 Scheme of CCTV to be submitted and agreed
20 Speed humps to car park
21 Boundary treatment
22 Scheme of management of open space - to include cutting
23 Scheme of lighting to be submitted and agreed
24 Scheme of street furniture to be submitted and agreed
25 Materials – to include surfacing materials
It was requested that a letter be sent to regeneration to ask them to investigate further the possibility of opening up the closed archway under the railway line to improve connectivity from the railway station to the town centre for pedestrians and cyclists.
Publication date: 30/03/2010
Date of decision: 24/03/2010
Decided at meeting: 24/03/2010 - Strategic Planning Board