To consider the above application.
Minutes:
Consideration was given to the above planning application.
The following attended the meeting and made representations in relation to the application;
Councillor L Buchanan (Ward Councillor) – statement read out
Cllr Claire Wain - Shavington-cum-Gresty Parish Council
Jon Suckley – Agent
Members noted the content of the update report.
RESOLVED:
That application 25/2405/OUT be APPROVED subject to confirmation of the Natural England Licence, Section 106 Agreement, and the following conditions to secure:
|
S106 |
Amount |
Trigger |
|
Affordable Housing |
30% (65% Affordable / Social Rent / 35% Intermediate) |
In accordance with phasing plan to be submitted |
|
Health |
£108,480 (£904 per dwelling) |
50% prior to first occupation 50% at occupation of 51st dwelling |
|
Education |
£705,125.00 (£450,032.00 for Secondary and £255,093.00 for SEN) |
50% prior to first occupation 50% at occupation of 51st dwelling |
|
Public Transport |
£100k per year for 2 years (£200k total) for public transport |
Prior to the occupation of the 31st dwelling (25% of build out) |
|
Public Rights of Way |
£120k for PROW/LCWIP improvement to the north |
Prior to the occupation of the 61st dwelling (50% of build out) |
|
Highways |
£5k for Highways to assess speed limit amendment against their speed management plan
S278 works |
On commencement of development
Prior to occupation of first dwelling |
|
Outdoor Sport |
£1,614.79 per family dwelling (2+ bedrooms) £807.39 per bed space in apartments (capped £1,614.79) |
On first occupation |
|
Public Open Space LEAP and LAP |
Private Management Company for Areas of Open Space and / or transferred to the Council with ongoing maintenance |
On first occupation |
|
Provision of LEAP on site Provision of LAP on site |
On occupation of 51st dwelling |
|
|
Indoor Recreation |
£21,449.06 |
On first occupation |
1.Time limit for submission of reserved matters
2.Submission of Reserved Matters
3.Compliance with plans and details
4.Reserved matters application to be supported by revised Arboricultural Impact Assessment, Tree Protection Plan and Method Statement
5. Prior to commencement of access works a scheme for the protection of the retained trees, including a tree protection plans and an arboricultural method statement (AMS)
6. Reserved matters application to be supported by a revised FRA and detailed drainage strategy / design, associated management / maintenance plan
7.Reserved matters application to be supported by scheme of foul and surface water drainage to be submitted, approved and implemented. Foul and surface water drainage shall be connected on separate systems.
8.Reserved matters application to include details of all hard and soft landscaping
9.Reserved matters application to include details of maintenance and management of all landscaping
10.Reserved matters application to be supported by details of boundary treatments
11.Reserved matters to be supported by detailed proposed and finished ground and floor levels
12.Reserved matters to be supported by a noise impact assessment and mitigation
13. Submission of a contaminated land survey
14. Remediation of contaminated land
15. Submission of soil verification report prior to first occupation of units to which they relate
16. No trees, shrubs or hedges within the site which are shown as being retained on the approved plans shall be felled, uprooted, wilfully damaged or destroyed, cut back in any way or removed without the prior written consent of the Local Planning Authority.
17.Hedgehog RAMs
18.Lighting / Bats
19. Ecological enhancement
20. Biodiversity Net Gain
21. Entry into District level licencing for Great Crested Newts
22. Incorporation of a pond to provide compensation for common toad.
23. Access and highways work in accordance with plans
24. Visibility splay in accordance with plans
25. Maintenance scheme for hedgerow adjacent to Crewe Road/Gresty Land
26. Construction Environmental Management Plan submitted, approved and implemented
27. Scheme of Piling works / floor floating operations to be submitted, approved and implemented
28. Dust control scheme to be submitted, approved and implemented
29. Ultra-low emission boilers
30. Provision of electric vehicle infrastructure (charging points) at each property with private off-road parking prior to first occupation
31. Nesting Birds Survey to be carried if works are to be carried out during the bird breeding season
In the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions /informatives /planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Planning has delegated authority to do so in consultation with the Chairman of the Strategic Planning Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Supporting documents: