To consider the above planning application.
Minutes:
Consideration was given to the planning application.
The following attended the meeting and spoke in relation to the application:
· Councillor Alison Heler (Ward Councillor) – Councillors Heler provided a written statement which was read to the committee by the Chair
· Matthias Bunte (objector)
· Andrew Jalali (agent)
RESOLVED (by majority):
That for the reasons set out in the report the application be APPROVED, subject to the completion of a S106 Agreement with the following Heads of Terms from the report:
|
S106 |
Amount |
Triggers |
|
NHS |
£48,816 towards improved health infrastructure facilities within the Ashfields Primary Care Centre |
To be paid prior to the occupation of the 27th dwelling |
|
Amenity Green Space and Play Provision |
On site provision of Open Space and a LEAP.
Scheme of Management to be submitted and approved |
Shall be provided prior to occupation of the 27th dwelling
Shall be provided before first occupation.
|
|
Outdoor and Indoor Sport |
Outdoor sport contribution is £1,614.79 per family dwelling or £807.37 per bed space in apartments (to a maximum of £1,614.79).
Indoor sport contribution is £9,652,08
|
To be paid prior to the occupation of the 18th dwelling
|
|
Education
|
£426,859.00 towards Primary, Secondary & SEN education |
To be paid prior to the occupation of the 27th dwelling
|
|
Housing |
100% on site provision 30 social or affordable rented and 24 intermediate tenure
|
In accordance with a phasing plan |
And the following conditions from the report and update report:
1) 3 year time limit
2) Approved plans
3) Materials
4) Biodiversity Net Gain plan
5) 30-year habitat creation and habitat management and monitoring plan
6) Breeding Birds
7) Bat Sensitive Lighting
8) Great Crested Newt District Level Licencing
9) Development to proceed in accordance with the submitted bat
mitigation and compensation
10) Updated badger survey
11) Ecological enhancements
12) Submission of updated Arb Impact Assessment and Method
Statement
13) Levels of site and trees
14) Compliance with the Drainage Strategy
15) Sustainable Surface Water Drainage Scheme & Foul Water Drainage
Scheme
16) Landscaping scheme
17) Landscaping implementation
18) Landscaping management
19) Boundary treatment
20) Details of street materiality
21) Details of design, infrastructure and layout of the LEAP
22) Management and maintenance plan of the LEAP
23) Proposed finished levels including spot levels of the LEAP
24) Contaminated land – risk assessment
25) Contaminated land – verification report
26) Contaminated land – no exportation of soils
27) Contaminated land – unexpected contamination
28) At least 30% of dwellings in housing developments should comply
with requirement M4 (2) Category 2 of the Building Regulations
regarding accessible and adaptable dwellings
29) At least 6% of dwellings in housing developments should comply
with requirement M4 (3)(2)(a) Category 3 of the Building Regulations
regarding wheelchair adaptable dwellings.
30) Implementation of the proposed pedestrian infrastructure
improvements
31) Provision of the Toucan Crossing
32) Cycle storage for apartments/maisonettes
33) Construction management plan
34) Compliance with the submitted noise assessment
35) 10% energy from renewable or low carbon energy generation
36) Obscure glazing to bathroom window of plot 1
In the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Planning has delegated authority to do so in consultation with the Chairman of the Southern Planning Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Should the application be subject to an appeal, the following Heads of Terms should be secured as part of any S106 Agreement:
|
S106 |
Amount |
Triggers |
|
NHS |
£48,816 towards improved health infrastructure facilities within the Ashfields Primary Care Centre |
To be paid prior to the occupation of the 27th dwelling |
|
Amenity Green Space and Play Provision |
On site provision of Open Space and a LEAP.
Scheme of Management to be submitted and approved |
Shall be provided prior to occupation of the 27th dwelling
Shall be provided before first occupation.
|
|
Outdoor and Indoor Sport |
Outdoor sport contribution is £1,614.79 per family dwelling or £807.37 per bed space in apartments (to a maximum of £1,614.79).
Indoor sport contribution is £9,652,08 |
To be paid prior to the occupation of the 18th dwelling
|
|
Education
|
£426,859.00 towards Primary, Secondary & SEN education |
To be paid prior to the occupation of the 27th dwelling
|
|
Housing |
100% on site provision 30 social or affordable rented and 24 intermediate tenure |
In accordance with a phasing plan |
Supporting documents: