Agenda item

25/1757/FUL - LAND TO THE REAR OF AND INCLUDING, 481 CREWE ROAD, WINTERLEY: Erection of 54 affordable dwellings on land off Crewe Road, Winterley, with associated access, car parking, landscaping and infrastructure. No. 481 Crewe Road to be demolished to provide site access

To consider the above planning application.

Minutes:

Consideration was given to the planning application.

 

The following attended the meeting and spoke in relation to the application:

 

·         Councillor Alison Heler (Ward Councillor) – Councillors Heler provided a written statement which was read to the committee by the Chair

·         Matthias Bunte (objector)

·         Andrew Jalali (agent)

 

RESOLVED (by majority):

 

That for the reasons set out in the report the application be APPROVED, subject to the completion of a S106 Agreement with the following Heads of Terms from the report:

 

S106

Amount

Triggers

NHS

£48,816 towards improved

health infrastructure facilities

within the Ashfields Primary Care

Centre

To be paid prior to the

occupation of the 27th

dwelling

Amenity Green

Space and Play

Provision

On site provision of Open

Space and a LEAP.

 

 

Scheme of Management to

be submitted and

approved

Shall be provided prior to occupation of the 27th dwelling

 

Shall be provided before first occupation.

 

Outdoor and

Indoor Sport

Outdoor sport contribution is

£1,614.79 per family dwelling or

£807.37 per bed space in

apartments (to a maximum of

£1,614.79). 

 

Indoor sport contribution is

£9,652,08

 

To be paid prior to the

occupation of the 18th

dwelling

 

Education

 

£426,859.00 towards

Primary, Secondary & SEN

education

To be paid prior to the

occupation of the 27th

dwelling

 

Housing

100% on site provision

30 social or affordable rented and

24 intermediate tenure

 

In accordance with a phasing plan

 

And the following conditions from the report and update report:

 

1) 3 year time limit

2) Approved plans

3) Materials

4) Biodiversity Net Gain plan

5) 30-year habitat creation and habitat management and monitoring plan

6) Breeding Birds

7) Bat Sensitive Lighting

8) Great Crested Newt District Level Licencing

9) Development to proceed in accordance with the submitted bat

mitigation and compensation

10) Updated badger survey

11) Ecological enhancements

12) Submission of updated Arb Impact Assessment and Method

Statement

13) Levels of site and trees

14) Compliance with the Drainage Strategy

15) Sustainable Surface Water Drainage Scheme & Foul Water Drainage

Scheme

16) Landscaping scheme

17) Landscaping implementation

18) Landscaping management

19) Boundary treatment

20) Details of street materiality

21) Details of design, infrastructure and layout of the LEAP

22) Management and maintenance plan of the LEAP

23) Proposed finished levels including spot levels of the LEAP

24) Contaminated land – risk assessment

25) Contaminated land – verification report

26) Contaminated land – no exportation of soils

27) Contaminated land – unexpected contamination

28) At least 30% of dwellings in housing developments should comply

with requirement M4 (2) Category 2 of the Building Regulations

regarding accessible and adaptable dwellings

29) At least 6% of dwellings in housing developments should comply

with requirement M4 (3)(2)(a) Category 3 of the Building Regulations

regarding wheelchair adaptable dwellings.

30) Implementation of the proposed pedestrian infrastructure

improvements

31) Provision of the Toucan Crossing

32) Cycle storage for apartments/maisonettes

33) Construction management plan

34) Compliance with the submitted noise assessment

35) 10% energy from renewable or low carbon energy generation

36) Obscure glazing to bathroom window of plot 1

In the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Planning has delegated authority to do so in consultation with the Chairman of the Southern Planning Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.

 

 

 

 

Should the application be subject to an appeal, the following Heads of Terms should be secured as part of any S106 Agreement:

 

S106

Amount

Triggers

NHS

£48,816 towards improved

health infrastructure facilities

within the Ashfields Primary Care

Centre

To be paid prior to the

occupation of the 27th

dwelling

Amenity Green

Space and Play

Provision

On site provision of Open

Space and a LEAP.

 

 

Scheme of Management to

be submitted and

approved

Shall be provided prior to occupation of the 27th dwelling

 

 

Shall be provided before first occupation.

 

Outdoor and

Indoor Sport

Outdoor sport contribution is

£1,614.79 per family dwelling or

£807.37 per bed space in

apartments (to a maximum of

£1,614.79). 

 

Indoor sport contribution is

£9,652,08

To be paid prior to the

occupation of the 18th

dwelling

 

Education

 

£426,859.00 towards

Primary, Secondary & SEN

education

To be paid prior to the

occupation of the 27th

dwelling

 

Housing

100% on site provision

30 social or affordable rented and

24 intermediate tenure

In accordance with a phasing plan

 

 

 

 

Supporting documents: