To consider the above planning application.
Minutes:
Consideration was given to the planning application.
The following attended the meeting and spoke in relation to the application:
Councillor David Brown (ward councillor), Congleton Town Councillor Amanda Martin, Mr Ian Nisbet (supporter), Mr Phil Garner (agent) and Mr Howard Clayton (architect).
RESOLVED:
That for the reasons set out in the report and update report the application be APPROVED, subject to S106 agreement:
S106 |
Amount |
Triggers |
NHS |
£60,568 towards improved health infrastructure facilities within the Congleton Locality and Primary Care Network that supports patient care provision within the area:
• Lawton House Surgery • Meadowside Medical Centre • Readesmoor Medical Centre • Holmes Chapel Health Centre
|
To be paid prior to the occupation of the 7th dwelling |
POS |
Offsite contributions for POS are £2,346.81 per bed space in apartment.
Offsite contributions for GI Connectivity are £293.35 per bed
space in apartments to a maximum of £586.70 per apartment.
Outdoor sport contribution is £1,564.54 per family dwelling or £782.27 per bed space in apartments (to a maximum of £1,564.54 per apartment).
|
To be paid prior to the occupation of the 7th dwelling |
Canal and Rivers Trust
|
£20,000 towards towpath repairs in between Bridge 74 and Bridge 76, adjacent to the site |
To be paid prior to the occupation of the 7th dwelling
|
Education
|
£53,434.00 towards Secondary education |
To be paid prior to the occupation of the 7th dwelling
|
and the following conditions:
1) 3 year time limit
2) Development in accordance with the approved plans
3) Details of proposed materials
4) Implementation of visibility improvement works
5) Construction Management Plan
6) Risk assessment and method statement outing all works and construction methods carried out adjacent to the canal and canal cutting
7) Details of the maintenance and management of site drainage to protect the stability of the canal cutting
8) Drainage design must proceed in accordance with drainage strategy ‘10626-HBL-XX-XX-DR-C-0104’ Rev.P8. Dated 5.3.2024
9) No infiltration of surface water drainage into the ground
10) Low emission boilers
11) Compliance with the noise report
12) Contaminated land – risk assessment
13) Contaminated land – verification report
14) Contaminated land – no exportation of soils
15) Contaminated land – unexpected contamination
16) Contaminated land – risk assessment
17) Piling methods
18) Age restriction of occupants of the retirement living apartments
19) Compliance with landscaping plan
20) Compliance with boundary treatment plan
21) Details of proposed and existing levels
22) 30-year Habitat Management and Monitoring Plan
23) Breeding birds
24) Ecological enhancements
25) At least 30% of dwellings in housing developments should comply with requirement M4 (2) Category 2 of the Building Regulations regarding accessible and adaptable dwellings
26) At least 6% of dwellings in housing developments should comply with requirement M4 (3)(2)(a) Category 3 of the Building Regulations regarding wheelchair adaptable dwellings.
27) Age restriction not less than 60
28) No dig construction method
29) Compliance with the tree protection and special construction measures identified in the Arboricultural Statement ((CW/11462-AS-1) dated 19/3/2025 and Tree Protection Plan (CW/11462-P-TP-1) dated 19/3/2025
30) prior to commencement of development a Biodiversity Gain Plan shall be submitted and approved by the planning authority
31) prior to development above foundation stage full details of the design and specification of the proposed play area shall be submitted and approved by the planning authority
32) 10% renewables/low carbon energy provision
In the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Planning has delegated authority to do so in consultation with the Chair of the Southern Planning Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Should the application be subject to an appeal, the following Heads of Terms should be secured as part of any S106 Agreement:
S106 |
Amount |
Triggers |
NHS |
£60,568 towards improved health infrastructure facilities within the Congleton Locality and Primary Care Network that supports patient care provision within the area:
• Lawton House Surgery • Meadowside Medical Centre • Readesmoor Medical Centre • Holmes Chapel Health Centre
|
To be paid prior to the occupation of the 7th dwelling |
POS |
Offsite contributions for POS are £2,346.81 per bed space in apartment.
Offsite contributions for GI Connectivity are £293.35 per bed
space in apartments to a maximum of £586.70 per apartment.
Outdoor sport contribution is £1,564.54 per family dwelling or £782.27 per bed space in apartments (to a maximum of £1,564.54 per apartment).
|
To be paid prior to the occupation of the 7th dwelling |
Canal and Rivers Trust
|
£20,000 towards towpath repairs in between Bridge 74 and Bridge 76, adjacent to the site |
To be paid prior to the occupation of the 7th dwelling
|
Education
|
£53,434.00 towards Secondary education |
To be paid prior to the occupation of the 7th dwelling
|
The Committee requested that the case officer write to the Canal and River Trust to request safety improvements to the canal bridge on Morley Drive.
Supporting documents: