Agenda

Northern Planning Committee
Wednesday, 13th March, 2019 10.00 am

Venue: The Capesthorne Room - Town Hall, Macclesfield SK10 1EA. View directions

Contact: Sarah Baxter  Democratic Services Officer

Note: To register to speak on an application please email Speakingatplanning@cheshireeast.gov.uk 

Items
No. Item

1.

Apologies for Absence

To receive any apologies for absence.

2.

Declarations of Interest/Pre Determination

To provide an opportunity for Members and Officers to declare any disclosable pecuniary and non-pecuniary interests and for Members to declare if they have a pre-determination in respect of any item on the agenda.

3.

Minutes of the Previous Meeting pdf icon PDF 54 KB

To approve the Minutes of the meeting held on 13 February 2019 as a correct record.

4.

Public Speaking

A total period of 5 minutes is allocated for each of the planning applications for the following:

 

·         Ward Councillors who are not members of the Planning Committee

·         The relevant Town/Parish Council

 

A period of 3 minutes is allocated for each of the planning applications for the following individuals/groups:

 

  • Members who are not members of the planning committee and are not the Ward Member
  • Objectors
  • Supporters
  • Applicants

5.

18/5737M-Demolition of the existing structure and the construction of a three-bedroom dwelling, with associated external landscaping works and the formation of two parking spaces: Land Off, Shrigley Road North, Poynton for Mr Jonathan Bailey pdf icon PDF 525 KB

To consider the above application.

 

6.

18/6319C-Refurbishment and extension of existing Leisure Centre to include demolition of existing swimming pool and auxiliary buildings, new build pool including Reception and Changing Areas, plus refurbishment of existing Sports Hall and Gym Areas, Congleton Leisure Centre, Worrall Street, Congleton for Cheshire East Council pdf icon PDF 1 MB

To consider the above application.

7.

18/5811M-A new intake structure on the west bank roughly 20m upstream of the weir, 3.5m wide and protected by a coarse screen of 150mm aperture. 30m of 1500mm dia. buried low pressure pipeline. An Archimedes Screw turbine set onto concrete foundations within a 3m-wide channel constructed from sheet steel piles. A control building above the turbine 4m x 5.5m in plan enclosing the gearbox, generator and control equipment. A short tailrace channel delivering the flow back into the downstream weirpool. A buried electrical cable running 1000m to the switchroom at the Siemens factory in Congleton. Upgrading of the existing 'angler's footpath' with a post-and-beam raised boardwalk (1.2m width). The armoured power cable running across to Havannah Lane will be fixed beneath the boardwalk. 250m of temporary access track coming from the north, off the A536 through an adjacent field and down to the plateau above the intake and turbine locations, providing construction access to the hydro works pdf icon PDF 533 KB

To consider the above application.

8.

18/5001M-Erection of a ground floor extension to the rear of no.67 London Road and the associated amalgamation of internal floorspace and demolition of existing retail space to create a c.2,000 sq.ft unit (Class A1); reconfiguration of floorspace at first and second floor to create five two-bedroom apartments (Class C3); installation of a dormer window and all associated physical works and car parking, 65 & 67, London Road, Alderley Edge for Mr Alex Yeramain, CCM Industries pdf icon PDF 941 KB

To consider the above application.

9.

Planning Appeals pdf icon PDF 106 KB

To consider a report on the Planning Appeals.

Additional documents:

10.

Planning Updates pdf icon PDF 68 KB

Additional documents: